Solving Fuzzy Time–Cost Trade-Off in Construction Projects Using Linear Programming

被引:3
|
作者
Elkalla I. [1 ]
Elbeltagi E. [1 ]
El Shikh M. [1 ]
机构
[1] Structural Engineering Department, Faculty of Engineering, Mansoura University, Mansoura
关键词
Fuzzy time–cost trade-off; Linear programming; Nearest symmetric trapezoidal fuzzy number; Simplex method;
D O I
10.1007/s40030-020-00489-7
中图分类号
学科分类号
摘要
The time–cost trade-off has been recognized as a very significant aspect of construction management. Generally, time–cost trade-off can be modeled as a fuzzy linear programming problem with symmetric or non-symmetric fuzzy numbers. However, it was successfully solved when the fuzzy membership functions are only symmetric. In the present work, a novel approach is introduced to solve fuzzy linear programming problem with non-symmetric fuzzy membership functions by transforming it to its corresponding nearest symmetric one. The transformed problem is then converted to its crisp linear programming problem and then solved by the standard primal simplex method. Two examples are presented to show the effectiveness of the proposed approach, and the results are discussed. © 2020, The Institution of Engineers (India).
引用
收藏
页码:267 / 278
页数:11
相关论文
共 50 条
  • [1] Linear programming based approaches for the discrete time/cost trade-off problem in project networks
    Hafizoglu, A. B.
    Azizoglu, M.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2010, 61 (04) : 676 - 685
  • [2] Application of time-cost trade-off model in forest management projects: The case of Oak decline project
    Zandebasiri, Mehdi
    Vacik, Harald
    Etongo, Daniel
    Dorfstetter, Yasmin
    Soosani, Javad
    Pourhashemi, Mehdi
    JOURNAL OF FOREST SCIENCE, 2019, 65 (12) : 481 - 492
  • [3] A Multi-objective Stochastic Programming Approach for Project Time, Cost and Quality Trade-off Problem (TCQTP)
    Ahadian, Behrooz
    Veisy, Omid
    Azizi, Vahid
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2016, 10 (04) : 553 - 563
  • [4] Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling
    Tiwari S.
    Johari S.
    Journal of The Institution of Engineers (India): Series A, 2015, 96 (1) : 37 - 46
  • [5] COST OPTIMIZATION OF MULTIUNIT CONSTRUCTION PROJECTS USING LINEAR PROGRAMMING AND METAHEURISTIC-BASED SIMULATED ANNEALING ALGORITHM
    Podolski, Michal
    Sroka, Bartlomiej
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (08) : 848 - 857
  • [6] Solving a full fuzzy linear programming using lexicography method and fuzzy approximate solution
    Lotfi, F. Hosseinzadeh
    Allahviranloo, T.
    Jondabeh, M. Alimardani
    Alizadeh, L.
    APPLIED MATHEMATICAL MODELLING, 2009, 33 (07) : 3151 - 3156
  • [7] Trade-off between time and cost in project planning: a simulation-based optimization approach
    Senses, Sena
    Kumral, Mustafa
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2024, 100 (02): : 127 - 143
  • [8] Two approaches of solving linear programming with fuzzy parameters
    Mamat, Mustafa
    Rokhayati, Yeni
    Abdullah, Lazim
    Malik, Siti Madhihah Abdul
    JOURNAL OF INTERDISCIPLINARY MATHEMATICS, 2009, 12 (06) : 805 - 814
  • [9] On solving fuzzy linear fractional programming in material aspects
    Srinivasan, R.
    MATERIALS TODAY-PROCEEDINGS, 2020, 21 : 155 - 157
  • [10] A NEW APPROACH FOR SOLVING FULLY FUZZY LINEAR FRACTIONAL PROGRAMMING PROBLEMS USING THE MULTI-OBJECTIVE LINEAR PROGRAMMING
    Das, Sapan Kumar
    Mandal, Tarni
    Edalatpanah, S. A.
    RAIRO-OPERATIONS RESEARCH, 2017, 51 (01) : 285 - 297