Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization

被引:0
作者
Vedat Toğan
M. Azim Eirgash
机构
[1] Karadeniz Technical University,Dept. of Civil Engineering
来源
KSCE Journal of Civil Engineering | 2019年 / 23卷
关键词
critical path method; multi-objective optimization; meta-heuristic algorithm; time-cost trade-off problem;
D O I
暂无
中图分类号
学科分类号
摘要
Accelerating the project schedule raises the total cost of the project and shall be efficient only up to a certain limit. A Time-Cost Trade-off Problem (TCTP) is utilized to detect the optimal set of time-cost alternatives to enhance the overall construction project benefit. In this study, to find a set of Pareto front solutions, a multi-objective optimization model which is based on the Teaching- Learning Based Optimization (TLBO) incorporated with the Modified Adaptive Weight Approach (MAWA), is proposed. Four examples of construction projects taken from the technical literature ranging from 7 to 63 activities are investigated to show the performance of the MAWA-TLBO. The results are compared with those obtained using previously proposed models considering the optimal or near optimal solutions. It was found that the MAWA-TLBO algorithm works effectively for the TCTP in construction engineering and management field.
引用
收藏
页码:10 / 20
页数:10
相关论文
共 77 条
  • [1] Afshar A.(2009)Nondominated archiving multicolumn ant algorithm in time–cost trade-off optimization Journal Construction Engineering and Management 135 668-674
  • [2] Ziaraty A. K.(2016)Applied discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem Expert System with Applications 51 177-185
  • [3] Kaveh A.(2011)Optimization of project time-cost trade-off problem with discounted cash flows Journal of Construction Engineering and Management 137 65-71
  • [4] Sharifi F.(2014)Construction time-cost optimization modelling using ant colony optimization Journal of Engineering 20 1-18
  • [5] Aminbakhsh S.(2012)Probabilistic multiobjective wind-thermal economic emission dispatch based on point estimated method Energy 37 322-335
  • [6] Sönmez R.(1994)Ant system for jobshop scheduling Belgian Journal of Operations Research, Statistics and Computer Science (JORBEL) 34 39-53
  • [7] Ammar M. A.(2015)A teaching learning based optimization for truss structures with frequency constraints Structural Engineering and Mechanics 53 833-845
  • [8] Azeez M. N.(2007)Expanding finance-based scheduling to devise overall-optimized project schedules Journal of Construction Engineering and Management 133 86-90
  • [9] Alsaffar A.(2005)Comparison among five evolutionary-based optimization algorithms Advanced Engineering Informatics 19 43-53
  • [10] Azizipanah-Abarghooee R.(2010)GA-based multi-objective optimization of finance-based construction project scheduling KSCE Journal of Civil Engineering 14 627-638