共 84 条
[1]
Adibi MA(2014)A clustering-based modified variable neighborhood search algorithm for a dynamic job shop scheduling problem International Journal of Advanced Manufacturing Technology 70 1955-1961
[2]
Shahrabi J(2004)Handling multiple objectives with particle swarm optimization IEEE Transactions on Evolutionary Computation 8 256-279
[3]
Coello CAC(1999)A genetic algorithm based approach for scheduling of dual-resource constrainded manufacturing systems Journal of Manufacturing Systems 48 369-372
[4]
Pulido GT(2000)Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms Journal of Manufacturing Systems 19 186-201
[5]
Lechuga MS(1996)Scheduling research in multiple resource constrained job shop: A review and critique International Journal of Production Research 8 2077-2097
[6]
ElMaraghy H(2013)Lateness minimization with Tabu search for job shop scheduling problem with sequence dependent setup times Journal of Intelligent Manufacturing 24 741-754
[7]
Patel V(2006)Study of fuzzy job shop scheduling problems with dualresource and multi-process routes Mechanical Science and Technology 12 1424-1427
[8]
Ben Abdallah I(2002)Approach by localization and multi-objective evolutionary optimization for flexible job-shop scheduling problems IEEE Transaction on Systems, Man, and Cybernetics Part C: Applications and Reviews 32 1-13
[9]
ElMaraghy H(2014)Simulation and parameter optimization of flux cored arc welding using artificial neural network and particle swarm optimization algorithm Journal of Intelligent Manufacturing 25 67-76
[10]
Patel V(1983)Optimization by simulated annealing Science 220 671-680