共 72 条
[1]
Carpov S(2012)Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage Comput. Oper. Res. 39 736-745
[2]
Carlier J(2016)Two-stage, single-lot, lot streaming problem for a 1+2 hybrid flow shop J. Global Optim. 66 263-290
[3]
Nace D(1990)Matrix multiplication via arithmetic progressions J. Symb. Comput. 9 251-280
[4]
Sirdey R(1997)Agile manufacturing research: accomplishments and opportunities IIE Trans. 29 813-823
[5]
Cheng M(2009)Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns Int. J. Adv. Manuf. Technol. 42 189-201
[6]
Sarin SC(1988)Two-stage, hybrid flowshop scheduling problem J. Oper. Res. Soc. 39 359-364
[7]
Singh S(1991)Schedules for a two-stage hybrid flowshop with parallel machines at the second stage Int. J. Prod. Res. 29 1489-1502
[8]
Coppersmith D(1994)Scheduling a two-stage hybrid flowshop with separable setup and removal times Eur. J. Oper. Res. 77 415-428
[9]
Winograd S(1996)Preemptive scheduling in a two-stage multiprocessor flow shop is np-hard Eur. J. Oper. Res. 89 172-175
[10]
Devor R(2002)Scheduling hybrid flow shops in printed circuit board assembly lines Prod. Oper. Manag. 11 216-230