Benefits of robust multiobjective optimization for flexible automotive assembly line balancing

被引:0
作者
Manuel Chica
Joaquín Bautista
Jesica de Armas
机构
[1] The University of Newcastle,School of Electrical Engineering and Computing
[2] Universitat Politcnica de Catalunya,ETSEIB
[3] Universitat Pompeu Fabra,Department of Economics and Business
来源
Flexible Services and Manufacturing Journal | 2019年 / 31卷
关键词
Flexibility; Assembly line balancing; Uncertain demand; Robust optimization;
D O I
暂无
中图分类号
学科分类号
摘要
Changing conditions and variations in the demand are frequent in real industrial environments. Decision makers have to take into account this uncertainty and manage it properly. One clear example is the automotive industry where manufacturers have to assume an uncertain and heterogeneous demand. For instance, automotive manufacturers must adapt their decisions when balancing the assembly line by considering different flexible solutions. Our proposal is using robust multiobjective optimization and simulation techniques to provide managers with a set of robust and equally-preferred solutions for assembly line balancing. We study a Nissan case where the demand of each product family is uncertain. The problem is addressed by considering a robust multiobjective model for assembly line balancing based on a high number of production plans. After the selection of six different assembly line configurations, we study the implications of robustness metrics based on workstations’ overload. We show that the adverse managerial effects of not having flexible line configuration when demand changes are alleviated. For the real Nissan automotive case, our analysis and conclusions show the managerial and industrial benefits of using robust assembly lines. We also encourage decision makers to use robust multiobjective optimization methods for selecting the most flexible decisions.
引用
收藏
页码:75 / 103
页数:28
相关论文
共 146 条
  • [1] AlGeddawy T(2010)Design of single assembly line for the delayed differentiation of product variants Flex Serv Manuf J 22 163-182
  • [2] ElMaraghy H(2013)A taxonomy of line balancing problems and their solution approaches Int J Prod Econ 142 259-277
  • [3] Battaïa O(2007)Ant algorithms for a time and space constrained assembly line balancing problem Eur J Oper Res 177 2016-2032
  • [4] Dolgui A(2015)Modeling and solving the mixed-model sequencing problem to improve productivity Int J Prod Econ 161 83-95
  • [5] Bautista J(2016)Models for assembly line balancing by temporal, spatial and ergonomic risk attributes Eur J Oper Res 251 814-829
  • [6] Pereira J(1986)A survey of exact algorithms for the simple assembly line balancing problem Manag Sci 32 909-932
  • [7] Bautista J(2002)Robust optimization—methodology and applications Math Program 92 453-480
  • [8] Alfaro R(2011)Theory and applications of robust optimization SIAM Rev 53 464-501
  • [9] Batalla C(2007)Robust optimization—a comprehensive survey Comput Methods Appl Mech Eng 196 3190-3218
  • [10] Bautista J(2007)A classification of assembly line balancing problems Eur J Oper Res 183 674-693