共 50 条
- [42] HB ROBINSON UNIT NO 2 OPERATING EXPERIENCE TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1973, 17 : 10 - 10
- [43] EXPERIENCE OF OPERATING A COMBINED PLATING AND HONING UNIT RUSSIAN ENGINEERING JOURNAL, 1980, 60 (09): : 57 - 58
- [44] Actual operating experience with a new NRU unit GAS PROCESSORS ASSOCIATION - SEVENTY-SIXTH ANNUAL CONVENTION, PROCEEDINGS, 1997, : 79 - 82
- [49] Simulation, Optimization and Control of Heavy Oil Upgrading Processes: Application to a Delayed Coking Unit 26TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING (ESCAPE), PT B, 2016, 38B : 1671 - 1676
- [50] Mathematical simulation for delayed coking furnace (3). Simulation calculation of delayed coking furnace Shiyou Xuebao, Shiyou Jiagong/Acta Petrolei Sinica (Petroleum Processing Section), 1997, 13 (03): : 78 - 87