Production of high-weldability steel for large-diameter pipe

被引:0
|
作者
S. Yu. Nastich
Yu. D. Morozov
B. F. Zin’ko
V. L. Kornilov
S. V. Denisov
E. A. Kudryakov
机构
[1] I. P. Bardin Central Research Institute of Ferrous Metallurgy,
[2] Magnitogorsk Metallurgical Combine,undefined
来源
Metallurgist | 2006年 / 50卷
关键词
Weldability; Ferrite; Carbon Content; Niobium; Strength Class;
D O I
暂无
中图分类号
学科分类号
摘要
The use of controlled rolling for coiled steels of type 05G1B — which are distinguished by their low carbon content (0.04–07%), economical alloying (Cr, Ni, Cu), and microalloying with niobium — ensures formation of the requisite set of characteristics in the coiled product: a combination of high strength with good weldability and cold resistance. This is achieved through the formation of a ferritic-bainitic structure with fine ferrite grains and dispersion-hardening of the steel by niobium carbonitrides. New high-weldability steel 05G1B can be recommended for use in the production of electric-welded large-diameter gas-line pipe of strength class K56.
引用
收藏
页码:54 / 60
页数:6
相关论文
共 50 条
  • [31] ANALYSIS OF LARGE-DIAMETER STEEL ROPES
    RAOOF, M
    KRAINCANIC, I
    JOURNAL OF ENGINEERING MECHANICS-ASCE, 1995, 121 (06): : 667 - 675
  • [32] Applications for high performance large diameter steel pipe
    Marshall, P
    Berg, B
    TUBULAR STRUCTURES IX, 2001, : 49 - 56
  • [33] Evaluation of as-hipped PM high speed steel for production of large-diameter cutting tools
    Mesquita, RA
    Barbosa, CA
    ADVANCED POWDER TECHNOLOGY III, 2003, 416-4 : 235 - 240
  • [34] PRODUCTIVITY IMPROVEMENT IN LARGE-DIAMETER WELDED PIPE MILL AT KASHIMA-STEEL-WORKS
    HIROSE, Y
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1994, 80 (06): : T97 - T100
  • [35] Laboratory Investigation of the Structural Performance of a Large-Diameter Steel-Reinforced Polyethylene Pipe
    Mai, Van Thien
    Moore, Ian D.
    Hoult, Neil A.
    JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2024, 15 (01)
  • [36] Pipe-Soil Interaction and Sensitivity Study of Large-Diameter Buried Steel Pipes
    Wu, He-Gao
    Yu, Jin-Hong
    Shi, Chang-Zheng
    Ma, Zhu
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (03) : 793 - 804
  • [37] Pipe-Soil Interaction and Sensitivity Study of Large-Diameter Buried Steel Pipes
    He-Gao Wu
    Jin-Hong Yu
    Chang-Zheng Shi
    Zhu Ma
    KSCE Journal of Civil Engineering, 2021, 25 : 793 - 804
  • [38] Application of high-strain testing in large-diameter steel pipe pile project in Rudong sea area
    Gu, Longsheng
    Zhang, Yuting
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2024, 46 : 138 - 142
  • [39] Investigation on flexural behavior of pretensioned prestressed steel strand high strength concrete large-diameter pipe piles
    Zhou J.
    Zhang X.
    Gong S.
    Chen G.
    Xu Q.
    Yu X.
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2022, 43 (08): : 282 - 292
  • [40] Shaping of sheet to produce large-diameter welded pipe
    Zvonarev D.Y.
    Osadchii V.Y.
    Romantsov A.I.
    Kolikov A.P.
    Steel in Translation, 2016, 46 (6) : 443 - 446