Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times

被引:2
作者
Chun-Lung Chen
Chuen-Lung Chen
机构
[1] National Chengchi University,Department of MIS
[2] Takming University of Science and Technology,Department of Accounting Information
来源
The International Journal of Advanced Manufacturing Technology | 2009年 / 43卷
关键词
Weighted number of tardy jobs; Unrelated parallel machine; Sequence-dependent setup; Variable neighborhood descent; Tabu search;
D O I
暂无
中图分类号
学科分类号
摘要
This paper proposes several hybrid metaheuristics for the unrelated parallel-machine scheduling problem with sequence-dependent setup times given the objective of minimizing the weighted number of tardy jobs. The metaheuristics begin with effective initial solution generators to generate initial feasible solutions; then, they improve the initial solutions by an approach, which integrates the principles of the variable neighborhood descent approach and tabu search. Four reduced-size neighborhood structures and two search strategies are proposed in the metaheuristics to enhance their effectiveness and efficiency. Five factors are used to design 32 experimental conditions, and ten test problems are generated for each condition. Computational results show that the proposed hybrid metaheuristics are significantly superior to several basic tabu search heuristics under all the experimental conditions.
引用
收藏
页码:161 / 169
页数:8
相关论文
共 50 条
  • [31] Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms
    Behnamian, J.
    Zandieh, M.
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (7-8) : 795 - 808
  • [32] A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times
    Angel-Bello, Francisco
    Alvarez, Ada
    Pacheco, Joaquin
    Martinez, Iris
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2011, 61 (04) : 797 - 808
  • [33] Solving the flexible job shop scheduling problem with sequence-dependent setup times
    Shen, Liji
    Dauzere-Peres, Stephane
    Neufeld, Janis S.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 265 (02) : 503 - 516
  • [34] A scatter search approach to sequence-dependent setup times job shop scheduling
    Manikas, Andrew
    Chang, Yih-Long
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (18) : 5217 - 5236
  • [35] A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times
    Xiao, Jing
    Yang, Huasheng
    Zhang, Canrong
    Zheng, Li
    Gupta, Jatinder N. D.
    COMPUTERS & OPERATIONS RESEARCH, 2015, 63 : 72 - 82
  • [36] Hybrid tabu search algorithm for unrelated parallel machine scheduling in semiconductor fabs with setup times, job release, and expired times
    Chen, Changyu
    Fathi, Mahdi
    Khakifirooz, Marzieh
    Wu, Kan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 165
  • [37] Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times
    Wang, Shijin
    Wang, Xiaodong
    Yu, Li
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2020, 7 (03) : 291 - 307
  • [38] HYBRID GENETIC ALGORITHM FOR ASSEMBLY FLOW-SHOP SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP AND TRANSPORTATION TIMES
    Dalfard, Vahid Majazi
    Ardakani, Allahyar
    Banihashemi, Tak Nazalsadat
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2011, 18 (04): : 497 - 504
  • [39] An exact decomposition method for unrelated parallel machine scheduling with order acceptance and setup times
    Wang, Shijin
    Wu, Ruochen
    Chu, Feng
    Yu, Jianbo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 175
  • [40] A two-stage Ant Colony Optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times
    Arnaout, Jean-Paul
    Rabadi, Ghaith
    Musa, Rami
    JOURNAL OF INTELLIGENT MANUFACTURING, 2010, 21 (06) : 693 - 701