共 56 条
[1]
Miltenburg J(1989)Level schedules for mixed-model assembly lines in just-in-time production systems Manage Sci 35 192-207
[2]
Miltenburg J(1990)A dynamic programming algorithm for scheduling mixed-model just-in-time production systems Math Comput Model 13 57-66
[3]
Steiner G(1991)Note on sequencing JIT mixed model assembly lines Manage Sci 37 904-910
[4]
Yeomans S(1991)Sequencing to minimize work overload in assembly lines with product options Manage Sci 37 572-586
[5]
Inman PR(1992)An analytic framework for sequencing mixed-model assembly lines Int J Prod Res 30 35-48
[6]
Bulfin RL(1979)A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor Int J Prod Res 17 233-247
[7]
Yano CA(2007)Product sequencing problem in mixed model assembly line to minimize unfinished works Comput Ind Eng 53 206-214
[8]
Rachamadugu R(2008)Minimizing work overload in mixed model assembly lines Int J Prod Econ 112 177-191
[9]
Bard JF(2008)Simple and U-type assembly line balancing problems with a learning effect Appl Math Model 32 2954-2961
[10]
Dar-El EM(1998)A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines Comput Oper Res 25 675-690