共 89 条
- [1] Wang XY(2010)Single machine common flow allowance scheduling with a rate-modifying activity Comput. Indus. Eng. 59 898-902
- [2] Wang MZ(2011)Scheduling deteriorating jobs with CON/SLK due date assignment on a single machine Int. J. Prod. Econ. 131 747-751
- [3] Li S(2014)Single-machine batch delivery scheduling and common due-date assignment with a rate-modifying activity Int. J. Prod. Res. 52 5583-5596
- [4] Ng CT(2014)Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs Appl. Math. Comput. 248 503-510
- [5] Yuan J(2016)Due date assignment and scheduling on a single machine with two competing agents Int. J. Prod. Res. 54 1152-1169
- [6] Yin YQ(2017)Common due date assignment and cumulative deterioration scheduling on a single machine Eng. Optim. 49 976-989
- [7] Cheng TCE(2017)Multiple common due-dates assignment and optimal maintenance activity scheduling with linear deteriorating jobs J. Indus. Manag. Optim. 13 713-720
- [8] Wu CC(2018)Single machine scheduling to minimise resource consumption cost with a bound on scheduling plus due date assignment penalties Int. J. Prod. Res. 56 3080-3096
- [9] Cheng SR(1998)Single facility scheduling with nonlinear processing times Comput. Indus. Eng. 14 387-393
- [10] Zhao C(1994)Scheduling jobs under simple linear deterioration Comput. Indus. Eng. 21 653-659