共 50 条
- [46] Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance Optimization Letters, 2012, 6 : 1855 - 1873
- [49] Heuristic algorithms for the two-machine flowshop with limited machine availability OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2001, 29 (06): : 599 - 608