Minmax due-date assignment on a two-machine flowshop

被引:0
|
作者
Baruch Mor
Gur Mosheiov
机构
[1] Ariel University,Department of Economics and Business Administration
[2] The Hebrew University,School of Business Administration
来源
Annals of Operations Research | 2021年 / 305卷
关键词
Scheduling; Two-machine flowshop; Due-date assignment; Minmax;
D O I
暂无
中图分类号
学科分类号
摘要
We extend two classical scheduling and due-date assignment models. In the first (known in the literature as DIF), due-dates are determined by penalties for exceeding pre-specified deadlines. In the second (known as SLK), due-dates are assigned to jobs as a (linear) function of their processing times. We focus on the minmax versions of these models, and extend the single machine versions to a two-machine flowshop. We further extend the settings to that of a due-window. All the problems studied in this note are shown to have polynomial time solutions.
引用
收藏
页码:191 / 209
页数:18
相关论文
共 50 条
  • [31] Due-date assignment with asymmetric earliness-tardiness cost
    Mosheiov, G
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (11) : 1222 - 1224
  • [32] DUE-DATE ASSIGNMENT TO MULTI-JOB CUSTOMER ORDERS
    BAGCHI, U
    JULIEN, FM
    MAGAZINE, MJ
    MANAGEMENT SCIENCE, 1994, 40 (10) : 1389 - 1392
  • [33] Algorithms for a two-machine flowshop problem with jobs of two classes
    Jeong, BongJoo
    Kim, Yeong-Dae
    Shim, Sang-Oh
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2020, 27 (06) : 3123 - 3143
  • [34] Heuristic algorithms for two-machine flowshop with availability constraints
    Liao, Li-Man
    Tsai, Chin-Hui
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (01) : 306 - 311
  • [35] Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times
    Iranpoor, Mehdi
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (04) : 1100 - 1108
  • [36] Two-machine flowshop group scheduling problem
    Yang, DL
    Chern, MS
    COMPUTERS & OPERATIONS RESEARCH, 2000, 27 (10) : 975 - 985
  • [37] Due-date assignment scheduling with only mean and support of processing times
    Yue, Qing
    Zhou, Shenghai
    Yan, Haiyan
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (04) : 1358 - 1381
  • [38] A two-machine flowshop scheduling problem with precedence constraint on two jobs
    Cheng, Shuenn-Ren
    Yin, Yunqiang
    Wen, Chih-Hou
    Lin, Win-Chin
    Wu, Chin-Chia
    Liu, Jun
    SOFT COMPUTING, 2017, 21 (08) : 2091 - 2103
  • [39] Due-Date assignment with acceptable lead-times on parallel machines
    Mor, Baruch
    Mosheiov, Gur
    COMPUTERS & OPERATIONS RESEARCH, 2024, 166
  • [40] A two-machine flowshop scheduling problem with precedence constraint on two jobs
    Shuenn-Ren Cheng
    Yunqiang Yin
    Chih-Hou Wen
    Win-Chin Lin
    Chin-Chia Wu
    Jun Liu
    Soft Computing, 2017, 21 : 2091 - 2103