共 53 条
[1]
Devireddy C.R.(1999)Feature-based modeling and neural network-based CAPP for integrated manufacturing International Journal of Computer Integrated Manufacturing 12 61-74
[2]
Ghosh K.(1995)Flexible process sequencing using petri net theory Computers & Industrial Engineering 28 279-290
[3]
Lee K.Y.(1999)Genetic algorithm in integrated process planning and scheduling Journal of Intelligent Manufacturing 107 169-179
[4]
Jung M.Y.(2000)Satisfying various requirements in different levels and stages of machining using one general ANN-based process model Journal of Materials Processing Technology 107 228-235
[5]
Morad N.(2006)The application of multi-agent systems for STEP-NC computer process planning of prismatic components International Journal of Machine Tools & Manufacture 46 559-574
[6]
Zalzala A.(2003)Editorial of the special issue on agent based manufacturing process planning and scheduling Journal of Intelligent Manufacturing 14 427-428
[7]
Monostori L.(1995)Distributed artificial intelligence in manufacturing systems control Computers & Industrial Engineering 29 199-203
[8]
Viharos Z.J.(1998)A multi-agent approach to process planning and fabrication in distributed manufacturing Computers & Industrial Engineering 35 455-460
[9]
Markos S.(1980)The contract net protocol: High-level communication and control in a distributed problem solver IEEE Transactions on Computers C- 29 1104-1113
[10]
Nassehi A.(1997)Process planning knowledge representation using an object-oriented data model International Journal of Computer Integrated Manufacturing 10 92-104