Performance prediction of tunnel boring machine through developing a gene expression programming equation

被引:0
作者
Danial Jahed Armaghani
Roohollah Shirani Faradonbeh
Ehsan Momeni
Ahmad Fahimifar
M. M. Tahir
机构
[1] Amirkabir University of Technology,Department of Civil and Environmental Engineering
[2] Tarbiat Modares University,Department of Mining
[3] University of Tehran,School of Civil Engineering
[4] Lorestan University,Faculty of Engineering
[5] Universiti Teknologi Malaysia,UTM Construction Research Centre, Institute for Smart Infrastructure and Innovative Construction (ISIIC), Faculty of Civil Engineering
来源
Engineering with Computers | 2018年 / 34卷
关键词
Tunnel boring machine; Penetration rate; Gene expression programming; Multiple regression;
D O I
暂无
中图分类号
学科分类号
摘要
The prediction of tunnel boring machine (TBM) performance in a specified rock mass condition is crucial for any mechanical tunneling project. TBM performance prediction in accurate may reduce the risks related to high capital costs and scheduling for tunneling. This paper presents a new model/equation based on gene expression programming (GEP) to estimate performance of TBM by means of the penetration rate (PR). To achieve the aim of the study, the Pahang–Selangor Raw Water Transfer tunnel in Malaysia was investigated and the data related to field observations and laboratory tests were used in modelling of PR of TBM. A database (1286 datasets in total) comprising 7 model inputs related to rock (mass and material) properties and machine characteristics and 1 output (PR) was prepared to use in GEP modelling. To evaluate capability of the developed GEP equation, a multiple regression (MR) model was also proposed. A comparison between the obtained results has been done using several performance indices and the best equations of GEP and MR were selected. System results for the developed GEP equation based on coefficient of determination (R2) were obtained as 0.855 and 0.829 for training and testing datasets, respectively, while these values were achieved as 0.795 and 0.789 for the developed MR equation. Concluding remark is that the GEP equation is superior in comparison with the MR equation and it can be introduced as a new equation in the field of TBM performance prediction.
引用
收藏
页码:129 / 141
页数:12
相关论文
共 50 条
  • [21] Influence of Tunnel Boring Machine Scraper Bucket Structure on the Mucking Performance
    Geng Q.
    Xie L.
    Zhang Z.
    Ye M.
    Yao Y.
    Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University, 2020, 54 (11): : 149 - 157
  • [22] Modeling tunnel boring machine performance by neuro-fuzzy methods
    Grima, MA
    Bruines, PA
    Verhoef, PNW
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2000, 15 (03) : 259 - 269
  • [23] Development of a new hybrid ANN for solving a geotechnical problem related to tunnel boring machine performance
    Koopialipoor, Mohammadreza
    Fahimifar, Ahmad
    Ghaleini, Ebrahim Noroozi
    Momenzadeh, Mohammadreza
    Armaghani, Danial Jahed
    ENGINEERING WITH COMPUTERS, 2020, 36 (01) : 345 - 357
  • [24] Development of a new hybrid ANN for solving a geotechnical problem related to tunnel boring machine performance
    Mohammadreza Koopialipoor
    Ahmad Fahimifar
    Ebrahim Noroozi Ghaleini
    Mohammadreza Momenzadeh
    Danial Jahed Armaghani
    Engineering with Computers, 2020, 36 : 345 - 357
  • [25] Prediction Performance of End-Milling Process by Gene Expression Programming
    Hayajneh, Mohammed T.
    Abdellahia, Majid
    JORDAN JOURNAL OF MECHANICAL AND INDUSTRIAL ENGINEERING, 2019, 13 (02) : 83 - 89
  • [26] Prediction Model of Tunnel Boring Machine Disc Cutter Replacement Using Kernel Support Vector Machine
    Liu, Yang
    Huang, Shuaiwen
    Wang, Di
    Zhu, Guoli
    Zhang, Dailin
    APPLIED SCIENCES-BASEL, 2022, 12 (05):
  • [27] A hybrid comprehensive performance evaluation approach of cutter holder for tunnel boring machine
    Yang, Mei
    Ji, Zhiyong
    Zhang, Ling
    Zhang, Aiwu
    Xia, Yimin
    ADVANCED ENGINEERING INFORMATICS, 2022, 52
  • [28] Prediction of the number of consumed disc cutters of tunnel boring machine using intelligent methods
    Afradi, Alireza
    Ebrahimabadi, Arash
    Hallajian, Tahereh
    MINING OF MINERAL DEPOSITS, 2021, 15 (04): : 68 - 74
  • [29] Finite element analysis and fatigue life prediction of tunnel boring machine cutter head
    He, Wenbin
    Jiang, Zhiwen
    Ming, Wuyi
    Jia, Lianhui
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2025,
  • [30] Developing a prediction model for rutting depth of asphalt mixtures using gene expression programming
    Majidifard, Hamed
    Jahangiri, Behnam
    Rath, Punyaslok
    Contreras, Loreto Urra
    Buttlar, William G.
    Alavi, Amir H.
    CONSTRUCTION AND BUILDING MATERIALS, 2021, 267