Performance prediction of tunnel boring machine through developing a gene expression programming equation

被引:0
作者
Danial Jahed Armaghani
Roohollah Shirani Faradonbeh
Ehsan Momeni
Ahmad Fahimifar
M. M. Tahir
机构
[1] Amirkabir University of Technology,Department of Civil and Environmental Engineering
[2] Tarbiat Modares University,Department of Mining
[3] University of Tehran,School of Civil Engineering
[4] Lorestan University,Faculty of Engineering
[5] Universiti Teknologi Malaysia,UTM Construction Research Centre, Institute for Smart Infrastructure and Innovative Construction (ISIIC), Faculty of Civil Engineering
来源
Engineering with Computers | 2018年 / 34卷
关键词
Tunnel boring machine; Penetration rate; Gene expression programming; Multiple regression;
D O I
暂无
中图分类号
学科分类号
摘要
The prediction of tunnel boring machine (TBM) performance in a specified rock mass condition is crucial for any mechanical tunneling project. TBM performance prediction in accurate may reduce the risks related to high capital costs and scheduling for tunneling. This paper presents a new model/equation based on gene expression programming (GEP) to estimate performance of TBM by means of the penetration rate (PR). To achieve the aim of the study, the Pahang–Selangor Raw Water Transfer tunnel in Malaysia was investigated and the data related to field observations and laboratory tests were used in modelling of PR of TBM. A database (1286 datasets in total) comprising 7 model inputs related to rock (mass and material) properties and machine characteristics and 1 output (PR) was prepared to use in GEP modelling. To evaluate capability of the developed GEP equation, a multiple regression (MR) model was also proposed. A comparison between the obtained results has been done using several performance indices and the best equations of GEP and MR were selected. System results for the developed GEP equation based on coefficient of determination (R2) were obtained as 0.855 and 0.829 for training and testing datasets, respectively, while these values were achieved as 0.795 and 0.789 for the developed MR equation. Concluding remark is that the GEP equation is superior in comparison with the MR equation and it can be introduced as a new equation in the field of TBM performance prediction.
引用
收藏
页码:129 / 141
页数:12
相关论文
共 50 条
  • [1] Performance prediction of tunnel boring machine through developing a gene expression programming equation
    Armaghani, Danial Jahed
    Faradonbeh, Roohollah Shirani
    Momeni, Ehsan
    Fahimifar, Ahmad
    Tahir, M. M.
    ENGINEERING WITH COMPUTERS, 2018, 34 (01) : 129 - 141
  • [2] Optimizing tunnel boring machine penetration rate prediction using gene expression programming and whale optimization algorithms
    Jahanmiri, Shirin
    Noorian-Bidgoli, Majid
    Dallaki, Ali
    MODELING EARTH SYSTEMS AND ENVIRONMENT, 2025, 11 (02)
  • [3] Several models for tunnel boring machine performance prediction based on machine learning
    Mahmoodzadeh, Arsalan
    Nejati, Hamid Reza
    Ibrahim, Hawkar Hashim
    Ali, Hunar Farid Hama
    Mohammed, Adil Hussein
    Rashidi, Shima
    Majeed, Mohammed Kamal
    GEOMECHANICS AND ENGINEERING, 2022, 30 (01) : 75 - 91
  • [4] Tunnel boring machine performance assessment and prediction applying hybrid artificial intelligence
    Wang, Hui
    Liu, Ensheng
    Wei, Hokai
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2024, 46 (02) : 4511 - 4528
  • [5] Applying Optimized Support Vector Regression Models for Prediction of Tunnel Boring Machine Performance
    Fattahi H.
    Babanouri N.
    Geotechnical and Geological Engineering, 2017, 35 (5) : 2205 - 2217
  • [6] Tunnel boring machine performance prediction with scaled rock cutting tests
    Entacher, Martin
    Lorenz, Stefan
    Galler, Robert
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2014, 70 : 450 - 459
  • [7] Predicting tunnel boring machine performance through a new model based on the group method of data handling
    Koopialipoor, Mohammadreza
    Nikouei, Sayed Sepehr
    Marto, Aminaton
    Fahimifar, Ahmad
    Armaghani, Danial Jahed
    Mohamad, Edy Tonnizam
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (05) : 3799 - 3813
  • [8] Predicting tunnel boring machine performance through a new model based on the group method of data handling
    Mohammadreza Koopialipoor
    Sayed Sepehr Nikouei
    Aminaton Marto
    Ahmad Fahimifar
    Danial Jahed Armaghani
    Edy Tonnizam Mohamad
    Bulletin of Engineering Geology and the Environment, 2019, 78 : 3799 - 3813
  • [9] Tunnel Boring Machine Performance Prediction Using Supervised Learning Method and Swarm Intelligence Algorithm
    Yu, Zhi
    Li, Chuanqi
    Zhou, Jian
    MATHEMATICS, 2023, 11 (20)
  • [10] Convolutional Neural Network for Predicting the Performance of a Tunnel Boring Machine
    Zhu, Yan
    Li, Min
    Nie, Yonghua
    Wang, Ruirui
    Wang, Yaxu
    Guo, Xu
    INDIAN GEOTECHNICAL JOURNAL, 2024, : 1895 - 1907