共 16 条
[1]
Galloway P.D., Survey of the construction industry relative to the use of CPM scheduling for construction projects, J. Constr. Eng. Manag. ASCE, 132, 7, pp. 697-711, (2006)
[2]
Hegazy T., Menesi W., Heuristic method for satisfying both deadlines and resource constraints, J. Constr. Eng. Manag., 138, 6, pp. 688-696, (2011)
[3]
Chassiakos A.P., Samaras C.I., Theodorakopoulos D.D., An integer programming method for CPM time-cost analysis, Comput. Model. Eng. Sci., 1, 4, pp. 9-18, (2000)
[4]
Hegazy T., Computer-Based Construction Project Management, (2002)
[5]
Kelley J.E., Critical-path planning and scheduling: mathematical basis, Oper. Res., 9, 3, pp. 167-179, (1961)
[6]
Burns S.A., Liu L., Feng C.W., The LP/IP hybrid method for construction time-cost trade-off analysis, Constr. Manag. Econ., 14, 3, pp. 265-276, (1996)
[7]
Ragsdale C., A new approach to implementing project networks in spreadsheets, INFORMS Trans. Educ., 3, 3, pp. 76-85, (2003)
[8]
Render B., Stair R.M., Introduction to Management Science, (1991)
[9]
Hegazy T., Optimization of resource allocation and leveling using genetic algorithms, J. Constr. Eng. Manag., 125, 3, pp. 167-175, (1999)
[10]
Son J., Mattila K., Binary resource leveling model: activity splitting allowed, J. Constr. Eng. Manag., 130, 6, pp. 887-894, (2004)