Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems

被引:0
|
作者
Aseem K. Mishra
Divya Shrivastava
Devesh Tarasia
Abdur Rahim
机构
[1] Birla Institute of Management Technology,Department of Operations & Decision Sciences
[2] Shiv Nadar University,Department of Mechanical Engineering
[3] Northeastern University,Faculty of Business Administration
[4] University of New Brunswick,undefined
来源
关键词
Production scheduling; Group maintenance; Integration; Multi-machine multi-component system; Jaya algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
This paper addresses the joint optimization model of production scheduling, work-in-process (WIP) inventory control and group preventive maintenance (PM) planning in a multi-machine system with multi-components. The objective is to obtain optimum production sequence, PM intervals and grouping of components, which minimize the total expected cost per unit time of the system. A new meta-heuristic named Jaya algorithm and two popular algorithms viz. simulated annealing (SA) and particle swarm optimization (PSO) are applied to optimize the objective function. Initially, the optimum group of components is obtained based on the integer multiples of individual PM intervals. Secondly, the job permutation sequence incorporating group PM intervals is identified with the largest order value (LOV) rule. The shift in optimum PM intervals is realized with an advanced-postpone balancing approach. Computational results reveal that the proposed integrated model along with group PM yields up to 25% cost reductions when compared to the integrated model with individual maintenance as well as 37% savings while no integration is performed. Furthermore, the performance of algorithms is evaluated with large-sized problems. The obtained results show that Jaya and SA yielded comparable results, however, PSO is least productive. Thus, the proposed approach yields better economic performance and brings more improvised solutions as compared to the conventional methods of integrated scheduling and maintenance optimization problems.
引用
收藏
页码:401 / 444
页数:43
相关论文
共 50 条
  • [1] Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems
    Mishra, Aseem K.
    Shrivastava, Divya
    Tarasia, Devesh
    Rahim, Abdur
    ANNALS OF OPERATIONS RESEARCH, 2022, 316 (01) : 401 - 444
  • [2] Joint optimization of production scheduling and machine group preventive maintenance
    Xiao, Lei
    Song, Sanling
    Chen, Xiaohui
    Coit, David W.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2016, 146 : 68 - 78
  • [3] Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
    Jin Yulan
    Jiang Zuhua
    Hou Wenrui
    The International Journal of Advanced Manufacturing Technology, 2008, 39 : 954 - 964
  • [4] Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
    Jin Yulan
    Jiang Zuhua
    Hou Wenrui
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 39 (9-10): : 954 - 964
  • [5] Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
    School of Mechanical Engineering, Shanghai Jiaotong University, Shanghai 200240, China
    International Journal of Advanced Manufacturing Technology, 2008, 39 (9-10): : 954 - 964
  • [6] Integrated optimization of production lot and maintenance planning in multi-machine serial system
    Leng Q.
    Wang L.
    Zhao S.
    Zheng Y.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2016, 22 (08): : 1945 - 1952
  • [7] Joint optimization of preventive maintenance and production scheduling for multi-state production systems based on reinforcement learning
    Yang, Hongbing
    Li, Wenchao
    Wang, Bin
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 214
  • [8] Multi-machine preventive maintenance scheduling with imperfect interventions: A restless bandit approach
    Ruiz-Hernandez, Diego
    Pinar-Perez, Jesus M.
    Delgado-Gomez, David
    COMPUTERS & OPERATIONS RESEARCH, 2020, 119
  • [9] Integrating preventive maintenance planning and production scheduling for a single machine
    Cassady, CR
    Kutanoglu, E
    IEEE TRANSACTIONS ON RELIABILITY, 2005, 54 (02) : 304 - 309
  • [10] Joint Optimization of Maintenance and Production Scheduling for Multi-component Systems
    Chen, Ming
    Kang, Yu
    Li, Pengfei
    2024 5TH INTERNATIONAL CONFERENCE ON MECHATRONICS TECHNOLOGY AND INTELLIGENT MANUFACTURING, ICMTIM 2024, 2024, : 99 - 103