共 131 条
- [1] Rivera-Gómez H(2021)Joint production, inspection and maintenance control policies for deteriorating system under quality constraint J Manuf Syst 60 585-607
- [2] Gharbi A(2021)Integrated production, maintenance and quality control policy for unreliable manufacturing systems under dynamic inspection Int J Prod Econ 236 108140-3392
- [3] Kenné JP(2008)Integrated production planning and preventive maintenance in deteriorating production systems Inf Sci 178 3382-5440
- [4] Ortiz-Zarco R(2008)An integrated production and maintenance model for one failure prone machine-finite capacity buffer system for perishable products with constant demand Int J Prod Res 46 5427-5712
- [5] Corona-Armenta JR(2011)Optimal integrated maintenance/production policy for randomly failing systems with variable failure rate Int J Prod Res 49 5695-602
- [6] Ait-El-Cadi A(2014)Joint optimisation of maintenance and production policies with subcontracting and product returns J Intell Manuf 25 589-904
- [7] Gharbi A(2020)Risk analysis for lot-sizing and maintenance optimization problems under energy constraints with a subcontractor solution Int. J. Qual. Reliab. Manag. 37 873-270
- [8] Dhouib K(2017)Joint integrated production-maintenance policy with production plan smoothing through production rate control J Manuf Syst 42 262-156
- [9] Artiba A(1991)A cumulative damage shock model with imperfect preventive maintenance Naval Res Logistics (NRL) 38 145-266
- [10] Aghezzaf EH(2000)General sequential imperfect preventive maintenance models Int J Reliab Qual Saf Eng 7 253-337