A robust scheduling of projects with time, cost, and quality considerations

被引:0
|
作者
Ali Salmasnia
Hadi Mokhtari
Isa Nakhai Kamal Abadi
机构
[1] Tarbiat Modares University,Department of Industrial Engineering, Faculty of Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2012年 / 60卷
关键词
Project scheduling; Time, cost, and quality trade-off; Robust approach; Multi-response;
D O I
暂无
中图分类号
学科分类号
摘要
Quality is one of the main pillars that should be effectively considered in managing of industrial projects. In traditional project scheduling problems, only the time and cost are considered without the quality parameters. In this paper, it is suggested that the quality parameter is embedded into the traditional time–cost trade-off problem to develop a time, cost, and quality trade-off problem (TCQTP) with some practical assumptions. To the best of our knowledge, this problem has not been extensively treated in literature yet. The contributions of this article are in threefold: (1) incorporating a practical assumption to the TCQTP that is a relaxation of deterministic assumption to stochastic ones, which no paper has ever attempted to consider it in TCQTP; (2) relaxing the linearity assumption of time function, cost function, and quality function to a general form; and (3) integrating the TCQTP with a robust solution method to minimize the variation effect on time, cost, and quality. Computational experiments, which were done on benchmark problem, show the applicability and good performance of suggested TCQTP.
引用
收藏
页码:631 / 642
页数:11
相关论文
共 50 条
  • [1] A robust scheduling of projects with time, cost, and quality considerations
    Salmasnia, Ali
    Mokhtari, Hadi
    Abadi, Isa Nakhai Kamal
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (5-8): : 631 - 642
  • [2] Scheduling projects with heterogeneous resources to meet time and quality objectives
    Tiwari, Vikram
    Patterson, James H.
    Mabert, Vincent A.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 193 (03) : 780 - 790
  • [3] Optimal segmentation of projects - Schedule and cost considerations
    Shtub, A
    Raz, T
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 95 (02) : 278 - 283
  • [4] A fuzzy robust scheduling approach for product development projects
    Wang, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) : 180 - 194
  • [5] Application of Three Metaheuristic Algorithms to Time-Cost-Quality Trade-Off Project Scheduling Problem for Construction Projects Considering Time Value of Money
    Kebriyaii, Omid
    Heidari, Ali
    Khalilzadeh, Mohammad
    Antucheviciene, Jurgita
    Pavlovskis, Miroslavas
    SYMMETRY-BASEL, 2021, 13 (12):
  • [6] Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
    Li, Hongbo
    Xu, Zhe
    Wei, Wenchao
    SUSTAINABILITY, 2018, 10 (08)
  • [7] Robust scheduling and robustness measures for the discrete time/cost trade-off problem
    Hazir, Oencue
    Haouari, Mohamed
    Erel, Erdal
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (02) : 633 - 643
  • [8] The PDBO Algorithm for Discrete Time, Cost and Quality Trade - off in Software Projects with Expressing Quality by Defects
    Saif, Abdulelah
    Abbas, Safia
    Fayed, Zaki
    INTERNATIONAL CONFERENCE ON COMMUNICATIONS, MANAGEMENT, AND INFORMATION TECHNOLOGY (ICCMIT'2015), 2015, 65 : 930 - 939
  • [9] Incorporating quality considerations into project time/cost tradeoff analysis and decision making
    Pollack-Johnson, Bruce
    Liberatore, Matthew J.
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2006, 53 (04) : 534 - 542
  • [10] A practical approach to project scheduling: considering the potential quality loss cost in the time-cost tradeoff problem
    Kim, JongYul
    Kang, ChangWook
    Hwang, InKeuk
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (02) : 264 - 272