The optimal number of used machines in a two-stage flexible flowshop scheduling problem

被引:0
|
作者
Enrique Gerstl
Gur Mosheiov
机构
[1] The Hebrew University,School of Business Administration
来源
Journal of Scheduling | 2014年 / 17卷
关键词
Scheduling; Sequencing; Deterministic; Flowshop; Makespan; Flowtime;
D O I
暂无
中图分类号
学科分类号
摘要
We study practical scheduling problems with a major decision referring to the number of machines to be used. We focus on a two-stage flexible flowshop, where each job is processed on the first (critical) machine, and then continues to one of the second-stage parallel machines. Jobs are assumed to have identical processing times, and are processed in batches. A setup time is required when starting a new batch. We consider two objective functions: minimum makespan and minimum flowtime. In both cases, a closed form expression for the optimal number of machines to be used is introduced, and a unique and unusual sequence of decreasing batch sizes is shown to be optimal.
引用
收藏
页码:199 / 210
页数:11
相关论文
共 50 条
  • [41] Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem
    Zheng, Shuang
    He, Zhengwen
    Yang, Zhen
    Chu, Chengbin
    Wang, Nengmin
    COMPUTERS & OPERATIONS RESEARCH, 2023, 153
  • [42] A discrete PSO for two-stage assembly scheduling problem
    Tian, Ye
    Liu, Dayou
    Yuan, Donghui
    Wang, Kunhao
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (1-4) : 481 - 499
  • [43] No-wait flowshop scheduling problem to minimize the number of tardy jobs
    Aldowaisan, Tariq A.
    Allahverdi, Ali
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (1-4) : 311 - 323
  • [44] Heuristic algorithms for preemptive scheduling in a two-stage hybrid flowshop with additional renewable resources at each stage
    Figielska, Ewa
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (04) : 509 - 519
  • [45] Metaheuristics for Two-stage No-Wait Flexible Flow Shop Scheduling Problem
    Ghaleb, Mageed A.
    Suryahatmaja, Umar S.
    Alharkan, Ibrahim M.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [46] A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages
    Figielska, Ewa
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 236 (02) : 433 - 444
  • [47] An effective two-stage iterated greedy algorithm for distributed flowshop group scheduling problem with setup time
    Wang, Yuhang
    Han, Yuyan
    Wang, Yuting
    Li, Junqing
    Gao, Kaizhou
    Liu, Yiping
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 233
  • [48] Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence
    Hwang, F. J.
    Lin, B. M. T.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (06) : 839 - 845
  • [49] Two-stage flow shop scheduling with dedicated machines
    Lin, Bertrand M. T.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1094 - 1097
  • [50] Scheduling two-stage production lines with multiple machines
    Qi, M
    PRODUCTION PLANNING & CONTROL, 1996, 7 (04) : 418 - 429