We study practical scheduling problems with a major decision referring to the number of machines to be used. We focus on a two-stage flexible flowshop, where each job is processed on the first (critical) machine, and then continues to one of the second-stage parallel machines. Jobs are assumed to have identical processing times, and are processed in batches. A setup time is required when starting a new batch. We consider two objective functions: minimum makespan and minimum flowtime. In both cases, a closed form expression for the optimal number of machines to be used is introduced, and a unique and unusual sequence of decreasing batch sizes is shown to be optimal.
机构:
Xi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China
Xi An Jiao Tong Univ, State Key Lab Mfg Syst Engn, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R ChinaXi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China
Zheng, Shuang
He, Zhengwen
论文数: 0引用数: 0
h-index: 0
机构:
Xi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R ChinaXi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China
He, Zhengwen
Yang, Zhen
论文数: 0引用数: 0
h-index: 0
机构:
Xi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China
Xi An Jiao Tong Univ, State Key Lab Mfg Syst Engn, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R ChinaXi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China
Yang, Zhen
Chu, Chengbin
论文数: 0引用数: 0
h-index: 0
机构:
Univ Paris Est, ESIEE Paris, F-93162 Noisy Le Grand, FranceXi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China
Chu, Chengbin
Wang, Nengmin
论文数: 0引用数: 0
h-index: 0
机构:
Xi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R ChinaXi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China