The optimal number of used machines in a two-stage flexible flowshop scheduling problem

被引:0
|
作者
Enrique Gerstl
Gur Mosheiov
机构
[1] The Hebrew University,School of Business Administration
来源
Journal of Scheduling | 2014年 / 17卷
关键词
Scheduling; Sequencing; Deterministic; Flowshop; Makespan; Flowtime;
D O I
暂无
中图分类号
学科分类号
摘要
We study practical scheduling problems with a major decision referring to the number of machines to be used. We focus on a two-stage flexible flowshop, where each job is processed on the first (critical) machine, and then continues to one of the second-stage parallel machines. Jobs are assumed to have identical processing times, and are processed in batches. A setup time is required when starting a new batch. We consider two objective functions: minimum makespan and minimum flowtime. In both cases, a closed form expression for the optimal number of machines to be used is introduced, and a unique and unusual sequence of decreasing batch sizes is shown to be optimal.
引用
收藏
页码:199 / 210
页数:11
相关论文
共 50 条
  • [1] The optimal number of used machines in a two-stage flexible flowshop scheduling problem
    Gerstl, Enrique
    Mosheiov, Gur
    JOURNAL OF SCHEDULING, 2014, 17 (02) : 199 - 210
  • [2] Bicriteria in a two-stage flowshop scheduling problem
    Bagga, PC
    Bhambani, A
    INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11) : 1475 - 1481
  • [3] A hybrid two-stage flowshop scheduling problem
    He, Longmin
    Sun, Shijie
    Luo, Runzi
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2007, 24 (01) : 45 - 56
  • [4] Two-stage hybrid flowshop scheduling with simultaneous processing machines
    Wang, Bailin
    Huang, Kai
    Li, Tieke
    JOURNAL OF SCHEDULING, 2018, 21 (04) : 387 - 411
  • [5] Two-stage hybrid flowshop scheduling with simultaneous processing machines
    Bailin Wang
    Kai Huang
    Tieke Li
    Journal of Scheduling, 2018, 21 : 387 - 411
  • [6] Scheduling in a two-stage flowshop with parallel unrelated machines at each stage and shared resources
    Figielska, Ewa
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 : 435 - 450
  • [7] Two-stage flexible flowshop scheduling with limited machine availability
    Wang, Xijun
    Xie, Jinxing
    Proceedings of the First International Conference on Information and Management Sciences, 2002, 1 : 209 - 213
  • [8] A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines
    Bajestani, Maliheh Aramon
    Beck, J. Christopher
    JOURNAL OF SCHEDULING, 2015, 18 (05) : 471 - 486
  • [9] THE TWO-STAGE ASSEMBLY FLOWSHOP SCHEDULING PROBLEM WITH SETUP TIMES
    Allahverdi, All
    Al-Anzi, Fawaz S.
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2029 - 2035
  • [10] Two-Stage Hybrid Flowshop Scheduling Problem with Waiting Time
    Sun, Heng
    Chung, Tsui-Ping
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 442 - 446