共 118 条
[1]
Avikal S(2013)A heuristic approach for U-shaped assembly line balancing to improve labor productivity Comput Ind Eng 64 895-901
[2]
Jain R(2013)A taxonomy of line balancing problems and their solution approaches Int J Prod Econ 142 259-277
[3]
Mishra PK(2009)Simple and U-type assembly line balancing by using an ant colony based algorithm Math Comput Appl 14 1-12
[4]
Yadav HC(2020)Mathematical model and bee algorithms for mixed-model assembly line balancing problem with physical human–robot collaboration Appl Soft Comput 93 106394-76
[5]
Battaïa O(2018)A mathematical model for semi-robotic assembly line balancing problem: a case study Int J Lean Think 9 70-4
[6]
Dolgui A(2019)Designing assembly lines with humans and collaborative robots: a genetic approach CIRP Ann 68 1-3015
[7]
Baykasoglu A(2020)A systematic review of research themes and hot topics in assembly line balancing through the web of science within 1990–2017 Computers Industr Eng 139 106182-346
[8]
Dereli T(2001)Balancing of U-type assembly systems using simulated annealing Int J Prod Res 39 3003-276
[9]
Çil ZA(2015)On the MILP model for the U-shaped assembly line balancing problems Eur J Oper Res 242 343-4649
[10]
Li Z(2020)Operations management issues in design and control of hybrid human-robot collaborative manufacturing systems: a survey Annu Rev Control 49 264-270