Balancing and scheduling of flexible mixed model assembly lines

被引:0
作者
Cemalettin Öztürk
Semra Tunalı
Brahim Hnich
M. Arslan Örnek
机构
[1] İzmir University of Economics,Department of Industrial Systems Engineering
[2] İzmir University of Economics,Department of Business Administration
[3] İzmir University of Economics,Department of Computer Engineering
来源
Constraints | 2013年 / 18卷
关键词
Mixed model assembly lines; Balancing; Sequencing; Scheduling; Mixed integer programming; Constraint programming; Decomposition;
D O I
暂无
中图分类号
学科分类号
摘要
Mixed model assembly line literature involves two problems: balancing and model sequencing. The general tendency in current studies is to deal with these problems in different time frames. However, in today’s competitive market, the mixed model assembly line balancing problem has been turned into an operational problem. In this paper, we propose mixed integer programming (MIP) and constraint programming (CP) models which consider both balancing and model sequencing within the same formulation along with the optimal schedule of tasks at a station. Furthermore, we also compare the proposed exact models with decomposition schemes developed for solving different instances of varying sizes. This is the first paper in the literature which takes into account the network type precedence diagrams and limited buffer capacities between stations. Besides, it is the first study that CP method is applied to balancing and scheduling of mixed model assembly lines. Our empirical study shows that the CP approach outperforms the MIP approach as well as the decomposition schemes.
引用
收藏
页码:434 / 469
页数:35
相关论文
共 50 条
  • [31] Scheduling Mixed-Model Assembly Lines with Cost Objectives by a Hybrid Algorithm
    Wang, Binggang
    Rao, Yunqing
    Shao, Xinyu
    Wang, Mengchang
    INTELLIGENT ROBOTICS AND APPLICATIONS, PT II, PROCEEDINGS, 2008, 5315 : 378 - 387
  • [32] Stochastic procedures for scheduling minimum job sets on mixed model assembly lines
    Bolat, A
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (05) : 490 - 501
  • [33] Balancing mixed-model assembly lines: a computational evaluation of objectives to smoothen workload
    Emde, Simon
    Boysen, Nils
    Scholl, Armin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (11) : 3173 - 3191
  • [34] Sequencing Mixed-Model Flexible Assembly Lines with Variable Launching Intervals
    童科娜
    徐克林
    郑永前
    JournalofShanghaiJiaotongUniversity(Science), 2013, 18 (04) : 460 - 467
  • [35] Sequencing mixed-model flexible assembly lines with variable launching intervals
    Tong, Ke-Na
    Xu, Ke-Lin
    Zheng, Yong-Qian
    Journal of Shanghai Jiaotong University (Science), 2013, 18 (04) : 460 - 467
  • [36] Sequencing procedure for balancing the workloads variations in case of mixed model assembly system with multiple secondary feeder lines
    Azzi, Anna
    Battini, Daria
    Faccio, Maurizio
    Persona, Alessandro
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (21) : 6081 - 6098
  • [37] Balancing of mixed-model parallel U-shaped assembly lines considering model sequences
    Kucukkoc, Ibrahim
    Zhang, David Z.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (20) : 5958 - 5975
  • [38] Dynamic Mixed Model Lotsizing and Scheduling for Flexible Machining Lines Using a Constructive Heuristic
    Yue, Lei
    Chen, Yarong
    Mumtaz, Jabir
    Ullah, Saif
    PROCESSES, 2021, 9 (07)
  • [39] Scheduling just-in-time part supply for mixed-model assembly lines
    Boysen, Nils
    Bock, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 211 (01) : 15 - 25
  • [40] Master production scheduling and sequencing at mixed-model assembly lines in the automotive industry
    Jan Dörmer
    Hans-Otto Günther
    Rico Gujjula
    Flexible Services and Manufacturing Journal, 2015, 27 : 1 - 29