共 98 条
[1]
Akella R(1986)Optimal control of production rate in a failure-prone manufacturing system IEEE Trans Autom Control AC-31 116-126
[2]
Kumar PR(1997)Scheduling of an unreliable manufacturing system with non-resumable set-ups Comput Ind Eng 32 909-925
[3]
Bai SX(1960)Optimal preventive maintenance policies Oper Res 8 90-100
[4]
Elhafsi M(2013)A sustainable EOQ model: theoretical formulation and applications Int J Prod Econ 149 145-153
[5]
Barlow RE(2010)Improved joint preventive maintenance and hedging point policy Int J Prod Econ 127 60-72
[6]
Hunter L(2011)Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell Omega 39 642-654
[7]
Battini D(1995)Interactions between operational research and environmental management Eur J Oper Res 85 229-243
[8]
Persona A(2012)Including sustainability criteria into inventory models Eur J Oper Res 222 229-240
[9]
Sgarbossa F(1991)Near optimal manufacturing flow controller design Int J Flex Manuf Syst 3 321-336
[10]
Berthaut F(2004)Analysis of a production/ inventory system with randomly failing production unit submitted to regular preventive maintenance Eur J Oper Res 156 712-718