A comprehensive solution for continuous casting production planning and scheduling

被引:0
作者
Mohammad Reza Yadollahpour
Behrooz ArbabShirani
机构
[1] Isfahan University of Technology,Department of Industrial and Systems Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2016年 / 82卷
关键词
Steelmaking; Continuous casting; Production planning; Scheduling; Modeling; Heuristics;
D O I
暂无
中图分类号
学科分类号
摘要
Production planning and scheduling in steelmaking-continuous casting (SCC) process consists of decision making about three important issues: consolidating orders into charges, grouping charges into casts, and scheduling the casts on machines. In contrast to earlier investigations that mostly focus on one of these issues, a comprehensive two-phase approach is presented in this paper in order to solve the whole problem. In the first phase, a continuous-time formulation is developed to determine what casts in what sequences should be scheduled on which machines. The solution obtained is then used as an optimal framework to create the final schedule in the second phase where the assignment rules embedded in a heuristic algorithm are used to consolidate orders into charges and group charges into casts. This method has been successfully used for Mobarakeh Steel Company (MSC), the biggest steel enterprise in the Middle East. Computational experiments demonstrate that the proposed method substantially increases the productivity in MSC.
引用
收藏
页码:211 / 226
页数:15
相关论文
共 62 条
[1]  
Tang L(2011)A combination of Lagrangian relaxation and column generation for order batching in steelmaking and continuous casting production Naval Res Logist (NRL) 58 370-388
[2]  
Wang G(1996)Primary production scheduling at steelmaking industries IBM J Res Dev 40 231-252
[3]  
Liu J(2004)The slab-design problem in the steel industry Interfaces 34 215-225
[4]  
Liu J(2000)The surplus inventory matching problem in the process industry Oper Res 48 505-516
[5]  
Lee HS(2014)Integrated charge batching and casting width selection at Baosteel Oper Res 62 772-787
[6]  
Murthy SS(2000)A lot grouping algorithm for a continuous slab caster in an integrated steel mill Prod Plan Control 11 363-368
[7]  
Haider SW(2008)Decision support system for the batching problems of steelmaking and continuous-casting production Omega 36 976-991
[8]  
Morse DV(2004)Production scheduling in a steelmaking-continuous casting plant Comput Chem Eng 28 2823-2835
[9]  
Dawande M(2009)A novel hybrid algorithm for scheduling steel-making continuous casting production Comput Oper Res 36 2450-2461
[10]  
Kalagnanam J(2006)A mixed-integer linear programming model for the continuous casting planning Int J Prod Econ 104 260-270