Multi-Objective Optimization-Simulation for Reliability-Based Inter-Basin Water Allocation

被引:2
作者
S. Jamshid Mousavi
Nasrin Rafiee Anzab
Bentolhoda Asl-Rousta
Joong Hoon Kim
机构
[1] Amirkabir University of Technology (Tehran Polytechnic),School of Civil and Environmental Engineering
[2] Korea University,School of Civil, Environmental and Architectural Engineering
来源
Water Resources Management | 2017年 / 31卷
关键词
Inter-basin water allocation; Multi-objective optimization; Simulation-optimization; Reliability;
D O I
暂无
中图分类号
学科分类号
摘要
A simulation-optimization framework is presented for reliability-based optimal sizing, operation, and water allocation in the Bashar-to-Zohreh inter-basin water transfer project. The problem was formulated as a mixed integer nonlinear program (MINLP), for which two solution approaches were tested, including gradient-based nonlinear programming and simulation-optimization (SO). The SO framework linked the water evaluation and planning system (WEAP) simulation module, benefiting from fast, single-period linear programming, to the multi-objective particle swarm optimization (MOPSO) for multiperiod optimization. The objective functions were minimizing the sizes of the project’s infrastructures and maximizing the reliability of supplying water to agricultural lands. The combination of nonlinear programming and the branch-and-bound algorithm was not able to solve the resulting MINLP. The results of the MOPSO-WEAP framework indicated that the project can supply water for land development in the Dehdasht and Choram agricultural plains, located in the less developed Kohgiluye and Boyer-Ahmad Province of Iran at an acceptable reliability level. For example, for one of the Pareto solutions found corresponding to maximum land development (30,000 ha), an average volume of 237 million cubic meter (MCM) is transferred annually at a 73.2% reliability level with average sizes of water transfer and storage elements. Further, design-operation and hydropower scenarios were also evaluated, and the Pareto solutions were obtained.
引用
收藏
页码:3445 / 3464
页数:19
相关论文
共 130 条
[1]  
Abed-Elmdoust A(2012)Water resources allocation using a cooperative game with fuzzy payoffs and fuzzy coalitions Water Resour Manag 26 3961-3976
[2]  
Kerachian R(2013)A cellular automata approach for the hydro-power operation of multi-reservoir systems Water Manag 166 465-478
[3]  
Afshar MH(2013)Multiobjective calibration of reservoir water quality modeling using Multiobjective particle swarm optimization (MOPSO) Water Resour Manag 27 1931-1947
[4]  
Afshar A(2015)Reliability based optimum reservoir design by hybrid ACO-LP algorithm Water Resour Manag 29 2045-33
[5]  
Shojaei N(2008)Reliability-based simulation-optimization model for multireservoir hydropower systems operations: Khersan experience J Water Resour Plan Manag 134 24-5727
[6]  
Sagharjooghifarahani M(2015)Development of a multi criteria decision making tool for a water resources decision support system Water Resour Manag 29 5713-265
[7]  
Afshar A(2008)Use of multiobjective particle swarm optimization in water resources management J Water Resour Plan Manag 134 257-38
[8]  
Masoumi F(2014)Dynamic management of water transfer between two interconnected river basins Resour Energy Econ 37 17-279
[9]  
Solis SS(2004)Handling multiple objectives with particle swarm optimization IEEE Trans Evol Comput 8 256-489
[10]  
Afzali R(2004)CalSim: generalized model for reservoir system analysis J Water Resour Plan Manag 130 480-26