共 100 条
[1]
Rose-Anderssen C(2008)Aerospace supply chains as evolutionary networks of activities: innovation via risk-sharing partnerships Creativity Innov Manag 17 304-318
[2]
Baldwin JS(2010)The hybrid flow shop scheduling problem Eur J Oper Res 205 1-18
[3]
Ridgway K(2010)Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective Comp Oper Res 37 1439-1454
[4]
Allen PM(2000)Scheduling with batching: a review Eur J Oper Res 120 228-249
[5]
Varga L(2006)A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor Int J Adv Manuf Technol 29 990-1001
[6]
Ruiz R(2014)Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates Appl Math Model 38 2490-2504
[7]
Vázquez-Rodríguez JA(2016)Hybrid flow shop batching and scheduling with a bi-criteria objective Int J Prod Econ 179 239-258
[8]
Ribas I(2009)Fuzzy scheduling of job orders in a two-stage flow-shop with batch-processing machines Int J Approx Reason 50 117-137
[9]
Leisten R(2009)Minimizing make-span in a two-machine flow-shop scheduling with batching and release time Math Comp Model 49 1071-1077
[10]
Framiñan JM(2012)Solving the serial batching problem in job shop manufacturing systems Eur J Oper Res 221 14-26