Parallel machine scheduling with earliness-tardiness penalties and space limits

被引:0
作者
Suk Jae Jeong
Kyung Sup Kim
机构
[1] Yonsei University,Department of Industrial and Information Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2008年 / 37卷
关键词
Parallel machine scheduling; Earliness-tardiness penalties; Heuristic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
In order to maximize an availability of machine and utilization of space, the parallel machines scheduling problem with space limit is frequently discussed in the industrial field. In this paper, we consider the parallel machine scheduling problem in which n jobs having different release times, due dates, and space limits are to be scheduled on m parallel machines. The objective function is to minimize the weighted sum of earliness and tardiness. To solve this problem, a heuristic is developed which is divided into three modules hierarchically: job selection, machine selection and job sequencing, and solution improvement. To illustrate its effectiveness, a proposed heuristic is compared with genetic algorithm (GA), hybrid genetic algorithm (HGA), and tabu search (TS), which are well-known meta-heuristics in a large number of randomly generated test problems based on the field situation. Also, we determine the job selection rule that is suitable to the problem situation considered in this paper and show the effectiveness of our heuristic method.
引用
收藏
页码:793 / 802
页数:9
相关论文
共 35 条
[1]  
Cheng TCE(1990)A state-of-the-art review of parallel-machine scheduling research Eur J Oper Res 47 271-292
[2]  
Sin CCS(1994)Parallel-machine scheduling problems with earliness and tardiness penalties J Oper Res Soc 45 685-695
[3]  
Cheng TCE(1995)Minmax earliness/tardiness scheduling in identical parallel machine system using genetic algorithms Comput Ind Eng 29 513-517
[4]  
Chen Z-L(1998)Scheduling under a common due-date on parallel unrelated machines Eur J Oper Res 105 494-501
[5]  
Cheng R(1999)Multiple-machine scheduling with earliness, tardiness and completion time penalty Comput Oper Res 26 45-57
[6]  
Gen M(1999)A column generation based decomposition algorithm for a parallel machine just-in-time scheduling problem Eur J Oper Res 116 220-232
[7]  
Tozawa T(2002)Parallel machine scheduling with a common due window Eur J Oper Res 136 512-527
[8]  
Adamopoulos GI(2003)Parallel machine earliness and tardiness scheduling with proportional weights Comput Oper Res 30 801-808
[9]  
Pappis CP(2006)A simulated annealing approach to makespan minimization on identical parallel machines Int J Adv Manuf Technol 31 328-334
[10]  
Biskup D(2006)Further study of minimizing total tardiness for the worker assignment scheduling problem in the identical parallel-machine models Int J Adv Manuf Technol 29 165-169