Quantitative Risk Allocation in Construction Projects Using Cooperative-Bargaining Game Theory

被引:5
作者
Farnad Nasirzadeh
Hamed Mazandaranizadeh
Mehdi Rouhparvar
机构
[1] Payame Noor University (PNU),Science and Research Branch
[2] Imam Khomeini International University,undefined
[3] Islamic Azad University,undefined
来源
International Journal of Civil Engineering | 2016年 / 14卷
关键词
Quantitative risk allocation; Bargaining game theory; Cooperative game theory; Payoff; Risk management;
D O I
暂无
中图分类号
学科分类号
摘要
This paper presents a cooperative-bargaining game model for quantitative risk allocation that extends the previous existing system dynamics (SD) based model. The proposed model accounts for both the client and the contractor costs to perform the quantitative risk allocation process. In this research, the behavior of contracting parties in the quantitative risk allocation process is modeled as the players’ behavior in a game. The cooperative game forms at a risk allocation percentage at which the summation of the client and the contractor costs are minimized. A bargaining process is then performed to share the benefit of a decrease in the contractor costs between the client and the contractor. To evaluate the performance of the proposed model, it has been employed in a pipeline project. The quantitative risk allocation is performed for the inflation as one of the most important identified risks. It is shown that using the proposed cooperative-bargaining game model, the percentage of risk allocated to the client is determined to be 100. Hence, the client and the contractor costs are decreased by 3.1 and 3.7 % in comparison to the previous SD-based risk allocation approach, respectively.
引用
收藏
页码:161 / 170
页数:9
相关论文
共 64 条
[1]  
Nasirzadeh F(2008)System dynamics approach to construction project risk management Int J Civ Eng 6 120-131
[2]  
Afshar A(2007)Modelling risk allocation decision in construction contracts Int J Project Manage 25 485-493
[3]  
Khanzadi M(1980)Allocating Risk and Incentive in Construction J Constr Div 106 297-305
[4]  
Lam KC(2003)Risk allocation and risk handling of highway projects in Taiwan J Manage Eng 19 60-68
[5]  
Wang D(2005)Theallocation of risk in PPP/PFI construction projects in theUK Int J Project Manage 23 25-35
[6]  
Lee PTK(2006)Good project governance for proper risk allocation in public–private partnerships in Indonesia Int J Project Manage 24 622-634
[7]  
Tsang YT(2007)Risk allocation in the private provision of public infrastructure Int J Project Manage 25 66-76
[8]  
Levitt RE(2008)Risk assessment and allocation in the UAE construction industry Int J Project Manage 26 431-438
[9]  
Logcher RD(2008)Perceptions of contractual risk allocation in construction supply chains J Prof Issues Eng Educ Pract 134 95-105
[10]  
Ashley DB(2007)A game theory approach for the allocation of risks in transport public private partnerships Int J Project Manage 25 213-218