共 29 条
[1]
Allahverdi A.(1999)A review of scheduling research involving setup considerations Omega 27 219-239
[2]
Gupta J. N. D.(2002)Optimal short-term scheduling of multiproduct single-stage batch plants with parallel lines Industrial Engineering & Chemistry Research 41 1249-1260
[3]
Aldowaisan T.(2003)Efficient scheduling of consumer goods manufacturing processes in the continuous time domain Computers & Operations Research 30 1367-1381
[4]
Chen C.(2003)An improved MILP formulation for sheduling multiproduct, multistage batch plants Industrial Engineering & Chemistry Research 42 2365-2380
[5]
Liu C.(2004)Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies Industrial Engineering & Chemistry Research 43 2516-2533
[6]
Feng X.(1999)Lotsizing and scheduling on parallel machines with sequence-dependent setup costs Management Science 45 273-289
[7]
Shao H.(1997)Planning and scheduling of parallel semicontinuous processes. 2. Short-term scheduling Industrial Engineering & Chemistry Research 36 2701-2714
[8]
Giannelos N. F.(2002)Scheduling parallel production lines with resource constraints. 1. Model formulation Industrial Engineering & Chemistry Research 41 779-789
[9]
Georgiadis M. C.(2003)Resource-constrained scheduling of parallel production lines using asynchronous slots Industrial Engineering & Chemistry Research 42 6832-6842
[10]
Gupta S.(2002)Practice-focused research issues for scheduling systems Production and Operations Management 11 249-258