The sequence-dependent assembly line balancing problem

被引:0
|
作者
Armin Scholl
Nils Boysen
Malte Fliedner
机构
[1] Friedrich-Schiller-Universität Jena,Fakultät für Wirtschaftswissenschaften, Lehrstuhl für Betriebswirtschaftliche Entscheidungsanalyse
[2] Universität Hamburg,Fakultät Wirtschafts
来源
OR Spectrum | 2008年 / 30卷
关键词
Assembly line balancing; Mass-production; Combinatorial optimization; Sequencing;
D O I
暂无
中图分类号
学科分类号
摘要
Assembly line balancing problems (ALBP) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing any unit of the products to be assembled among the work stations along the line. The sequence-dependent assembly line balancing problem (SDALBP) is an extension of the standard simple assembly line balancing problem (SALBP) which has significant relevance in real-world assembly line settings. SDALBP extends the basic problem by considering sequence-dependent task times. In this paper, we define this new problem, formulate several versions of a mixed-integer program, adapt solution approaches for SALBP to SDALBP, generate test data and perform some preliminary computational experiments. As a main result, we find that applying SALBP-based search procedures is very effective, whereas modelling and solving the problem with MIP standard software is not recommendable.
引用
收藏
页码:579 / 609
页数:30
相关论文
共 50 条
  • [1] The sequence-dependent assembly line balancing problem
    Scholl, Armin
    Boysen, Nils
    Fliedner, Malte
    OR SPECTRUM, 2008, 30 (03) : 579 - 609
  • [2] ASSEMBLY LINE BALANCING PROBLEM WITH STOCHASTIC SEQUENCE-DEPENDENT SETUP TIMES
    Diri, Zulal
    Mete, Suleyman
    Cil, Zeynel Abidin
    Agpak, Kursad
    PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2015, 21 (04): : 152 - 157
  • [3] The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics
    Scholl, Armin
    Boysen, Nils
    Fliedner, Malte
    OR SPECTRUM, 2013, 35 (01) : 291 - 320
  • [4] The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics
    Armin Scholl
    Nils Boysen
    Malte Fliedner
    OR Spectrum, 2013, 35 : 291 - 320
  • [5] Modeling and solving assembly line worker assignment and balancing problem with sequence-dependent setup times
    Yilmaz, Hamid
    SOFT COMPUTING, 2021, 25 (20) : 12899 - 12914
  • [6] Modeling and solving assembly line worker assignment and balancing problem with sequence-dependent setup times
    Hamid Yilmaz
    Soft Computing, 2021, 25 : 12899 - 12914
  • [7] An efficient hybrid genetic algorithm to solve assembly line balancing problem with sequence-dependent setup times
    Yolmeh, Abdolmajid
    Kianfar, Farhad
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (04) : 936 - 945
  • [8] Ant colony optimization for sequence-dependent disassembly line balancing problem
    Kalayci, Can B.
    Gupta, Surendra M.
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2013, 24 (03) : 413 - 427
  • [9] Investigating two variants of the sequence-dependent robotic assembly line balancing problem by means of a split-based approach
    Lahrichi, Youssef
    Damand, David
    Deroussi, Laurent
    Grangeon, Nathalie
    Norre, Sylvie
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (07) : 2322 - 2338
  • [10] A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks
    Seyed-Alagheband, S. A.
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (03) : 805 - 825