WARSYP: a robust modeling approach for water resources system planning under uncertainty

被引:0
|
作者
L.F. Escudero
机构
[1] Universidad Complutense de Madrid,Iberdrola Ingeniería y Consultoría, and Mathematical Sciences School
来源
关键词
Optimal Policy; Planning Horizon; Scenario Tree; Deterministic Case; Algorithmic Framework;
D O I
暂无
中图分类号
学科分类号
摘要
In this work we present a solution procedure for multiperiod water resources system planning, where the aim is to obtain the optimal policy for water resources utilization under uncertainty. The target levels to be achieved are related to the following parameters: reservoir capacity, hydropower demand and other demand uses for urban, industrial, irrigation, ecological and other purposes. The approach allows for the conjunctive use of surface systems together with groundwater. The hydrological exogenous inflow and demand of different kinds are considered via a scenario analysis scheme due to the uncertainty of the parameters. So, a multistage scenario tree is generated and, through the use of full recourse techniques, an implementable solution is obtained for each scenario group at each stage along the planning horizon. A novel scheme is presented for modeling the constraints to preserve the reserved stored water in (directly and non-directly) upstream reservoirs to satisfy potential future needs in demand centers at given time periods. An algorithmic framework based on augmented Lagrangian decomposition is presented. Computational experience is reported for the deterministic case.
引用
收藏
页码:313 / 339
页数:26
相关论文
共 50 条
  • [11] A minimax p-robust optimization approach for planning under uncertainty
    Seo, Kwang-Kyu
    Kim, Jun
    Chung, Byung Do
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2015, 9 (05): : 1 - 10
  • [12] Robust process planning under uncertainty
    Ahmed, S
    Sahinidis, NV
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (05) : 1883 - 1892
  • [13] ROBUST CAPACITY PLANNING UNDER UNCERTAINTY
    PARASKEVOPOULOS, D
    KARAKITSOS, E
    RUSTEM, B
    MANAGEMENT SCIENCE, 1991, 37 (07) : 787 - 800
  • [14] Robust process planning under uncertainty
    Ahmed, Shabbir
    Sahinidis, Nikolaos V.
    Industrial and Engineering Chemistry Research, 1998, 37 (05): : 1883 - 1892
  • [15] Modeling and Robust Optimization for System of Systems Problems under Uncertainty
    Liu, Peng
    Xia, Boyuan
    Tan, Yuejin
    Zhao, Danling
    2018 IEEE 4TH INTERNATIONAL CONFERENCE ON CONTROL SCIENCE AND SYSTEMS ENGINEERING (ICCSSE 2018), 2018, : 385 - 390
  • [16] Risk analysis methods of the water resources system under uncertainty
    Gui, Zeying
    Zhang, Chenglong
    Li, Mo
    Guo, Ping
    FRONTIERS OF AGRICULTURAL SCIENCE AND ENGINEERING, 2015, 2 (03) : 205 - 215
  • [17] Risk analysis methods of the water resources system under uncertainty
    Zeying GUI
    Chenglong ZHANG
    Mo LI
    Ping GUO
    FrontiersofAgriculturalScienceandEngineering, 2015, 2 (03) : 205 - 215
  • [18] Risk Aversion Based Inexact Stochastic Dynamic Programming Approach for Water Resources Management Planning under Uncertainty
    Liu, Zhenfang
    Zhou, Yang
    Huang, Gordon
    Luo, Bin
    SUSTAINABILITY, 2019, 11 (24)
  • [19] Multiobjective water resources investment planning under budgetary uncertainty and fuzzy environment
    Ministry of Public Works, Jakarta Selatan, Indonesia
    Eur J Oper Res, 3 (556-591):
  • [20] Modeling Performance and Uncertainty of Construction Planning under Deep Uncertainty: A Prediction Interval Approach
    Wang, Shuo
    Feng, Kailun
    Wang, Yaowu
    BUILDINGS, 2023, 13 (01)