Project portfolio selection for construction contractors by MCDM–GIS approach

被引:0
|
作者
A. Hashemizadeh
Y. Ju
机构
[1] Beijing Institute of Technology,School of Management and Economics
来源
International Journal of Environmental Science and Technology | 2019年 / 16卷
关键词
Project portfolio; Portfolio management; Strategy–project orientation; Multi-criteria decision-making; Analytic hierarchy process (AHP); Effective decision-making;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, project portfolio selection (PPS) is considered as one of the main steps in project portfolio management (PPM). PPS which depends on different criteria such as strategic, financial, as well as project specifications is also suggested for construction contractors. Although it is difficult to consider all these criteria, the decision will be inaccurate when some of them are ignored. The most common multi-criteria decision-making (MCDM) methodologies and geographic information system (GIS) are combined as a method, by which the potential projects obtain a strategic score by the analytical hierarchy process (AHP). Then, they are ranked according to technical criteria by the technique for order preference by similarity to ideal solution (TOPSIS). The proposed approach includes three ordinal phases. First, scoring potential projects due to the company strategy is conducted by the AHP to determine strategic-aligned projects (SAPs). Then, SAPs are ranked by TOPSIS. Finally, the final GIS sheet is prepared by the obtained technical score and communal criteria. This paper provides a clear and comprehensive insight to accept or reject SAPs by form a weighted sheet in GIS. It suggests that CCs select project portfolio according to all the financial and non-financial criteria. This approach can satisfy the PPM principals and resolve some of the shortcomings related to MCDM methods by GIS capacities to reduce complexity so that the decision-makers form project portfolios easily and effectively. This approach is described in a case study.
引用
收藏
页码:8283 / 8296
页数:13
相关论文
共 50 条
  • [31] Selection of composite materials for structural applications through MCDM approach
    Patnaik, Prabina Kumar
    Swain, Priyadarshi Tapas Ranjan
    Purohit, Abhilash
    MATERIALS TODAY-PROCEEDINGS, 2019, 18 : 3454 - 3461
  • [32] Research on the Construction of Energy Project Portfolio Management Process System
    Qiang, Ma
    AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (03): : 249 - 253
  • [33] Prevention Strategy of Highway Project Portfolio Construction Schedule Risk
    Bai L.-B.
    Zhang L.-Y.
    Sun Y.-C.
    Yang Q.
    Qin X.-L.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2021, 34 (09): : 203 - 214
  • [34] An MCDM project portfolio web-based DSS for sustainable strategic decision making in an electricity company
    Martins, Carolina Lino
    Losada Lopez, Hipolito Marcelo
    de Almeida, Adiel Teixeira
    Almeida, Jonatas Araujo
    de Oliveira Bortoluzzi, Mirian Batista
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2017, 117 (07) : 1362 - 1375
  • [35] External stakeholder risk response strategies selection in project portfolio
    Bai, Libiao
    Kang, Shuyun
    Li, Fang
    Zhang, Ziwen
    Li, Jiayu
    Luo, Xixi
    HELIYON, 2024, 10 (11)
  • [36] A Robust Human-Machine Framework for Project Portfolio Selection
    Chen, Hang
    Zhang, Nannan
    Dou, Yajie
    Dai, Yulong
    MATHEMATICS, 2024, 12 (19)
  • [37] Managing innovation portfolios: From project selection to portfolio design
    Si, Haijian
    Kavadias, Stylianos
    Loch, Christoph
    PRODUCTION AND OPERATIONS MANAGEMENT, 2022, 31 (12) : 4572 - 4588
  • [38] PROJECT PORTFOLIO SELECTION USING FUZZY AHP AND VIKOR TECHNIQUES
    Fouladgar, Mohammad Majid
    Yazdani-Chamzini, Abdolreza
    Zavadskas, Edmundas Kazimieras
    Yakhchali, Siamak Haji
    Ghasempourabadi, Mohammad Hossein
    TRANSFORMATIONS IN BUSINESS & ECONOMICS, 2012, 11 (01): : 213 - 231
  • [39] Landfill site selection using MCDM methods and GIS in the central part of the Nile Delta, Egypt
    Asaad M. Armanuos
    Khaled A. Elgaafary
    Tamer A. Gado
    Environmental Monitoring and Assessment, 2023, 195
  • [40] A Systemic Approach of Project Portfolio's Strategic Alignment
    Ma Biao
    Zhu Yu
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2229 - 2232