Corporate risk management for global contractors

被引:0
作者
Seung H. Han
Young Lee
Jong H. Ock
机构
[1] Yonsei University,Dept. of Civil and Environmental Engineering
[2] Daewoo Construction Company,Overseas Investment Division
[3] Ministry of Education and Human Resource Development,Education Facility Affairs Division
关键词
corporate risk management; globalization; multi-criteria integrated portfolio analysis; value at risk;
D O I
10.1007/BF02829127
中图分类号
学科分类号
摘要
While the globalization of international construction market provides tremendous opportunities for global contractors, the risk of international projects is significantly increasing. However, the traditional risk management approach for overseas projects has maintained a single profit focus. In addition, this approach does not consider the overall risk at the corporate level, but rather focuses on the individuals project. This paper discusses a corporate risk management approach that can be implemented from the initial stages of potential project selections. It then develops a multi-criteria integrated portfolio analysis tool to make strategic corporate level decisions for the selection of intermational projects. Finally, to demonstrate and validate the approach, a case study is conducted based on the historical data collected from a multi-national general contractor.
引用
收藏
页码:77 / 88
页数:11
相关论文
共 6 条
[1]  
Ahmad I.(1990)Decision support system for modeling bid/nobid decision problem Journal of construction engineering and management, ASCE 114 595-608
[2]  
McNew L.(1996)So near, so VAR Risk 9 54-56
[3]  
Millman G.J.(1998)The how of DOW: managing currency risk Financial Executive Nov./Dec. 19-24
[4]  
Shinks D.(1996)VAR for corporate Risk 9 28-29
[5]  
Spinner K.(1990)Adapting value at risk Global Finance Apr. 14-23
[6]  
Turner C.(1996)VAR as an industrial tool Risk 9 38-40