Quality improvement and redesign of performance measurement systems: an application to the academic field

被引:0
作者
Fiorenzo Franceschini
Elisa Turina
机构
[1] DISPEA,Politecnico di Torino
来源
Quality & Quantity | 2013年 / 47卷
关键词
Performance measurement system redesign; Quality improvement; Performance measurement; Indicators; Balanced scorecard; Higher education;
D O I
暂无
中图分类号
学科分类号
摘要
The increasing competition both in the public and private sectors gave rise to a growing interest in quality improvement and in designing and implementing Performance Measurement Systems (PMS). Academic organizations also recognized the need for implementing performance measurement systems. Some recent works on PMS in the higher education make use of the Kaplan and Norton’s Balanced Scorecard (BSC) to translate the characteristic strategic goals (e.g. research and teaching excellence) into performance measures. However, a PMS needs to be updated when external or internal changes influence the organization modus operandi. In this way a continuous quality improvement of organization performance is required. This paper describes a methodology based on the BSC model to redesign a current PMS. In detail, a reference BSC-check matrix is proposed. A “mapping analysis” of the current PMS is developed to understand if all the operational aspects involved in goals achievement are considered and if proper indicators have been defined. As an example, the methodology is applied to a Department of the authors’ own University. The paper shows also how the proposed approach can be extended to other contexts.
引用
收藏
页码:465 / 483
页数:18
相关论文
共 98 条
  • [1] Asan Ş.E.(2007)Integrating Hoshin Kanri and the balanced scorecard for strategic management: The case of higher education Total Qual. Manag. Bus. Excell. 18 999-1014
  • [2] Tanyas M.(2000)Dynamics of performance measurement systems Int. J. Oper. Prod. Manag. 20 692-704
  • [3] Bititci U.(2000)Designing, implementing and updating performance measurement systems Int. J. Oper. Prod. Manag. 20 754-771
  • [4] Turner T.(1994)A review and evaluation of logistics metrics Int. J. Logist. Manag. 5 11-28
  • [5] Begemann C.(2006)The application of balanced scorecard in the performance evaluation of higher education TQM Mag. 18 190-205
  • [6] Bourne M.(2002)Technology transfer analysis in the Italian National Research Council Technovation 22 291-299
  • [7] Mills J.(2006)Hypothesis generation in quality improvement projects: Approaches for exploratory studies Qual. Reliab. Eng. Int. 22 839-850
  • [8] Wilcox M.(1991)The performance measurement manifesto Harv. Bus. Rev. 69 131-137
  • [9] Neely A.(1996)Towards consistent performance management systems Int. J. Oper. Prod. Manag. 16 27-37
  • [10] Platts K.(2006)Classification of performance and quality indicators in manufacturing Int. J. Serv. Oper. Manag. 2 294-311