Dealing with uncertainty in risk assessments in early stages of a CO2 geological storage project: comparison of pure-probabilistic and fuzzy-probabilistic frameworks

被引:0
作者
A. Loschetter
J. Rohmer
L. de Lary
J. C. Manceau
机构
[1] BRGM,
来源
Stochastic Environmental Research and Risk Assessment | 2016年 / 30卷
关键词
Risk assessment; CO; storage; Uncertainty; Possibility; Epistemic;
D O I
暂无
中图分类号
学科分类号
摘要
CO2 capture and storage is recognized as a promising solution among others to tackle greenhouse gas emissions. This technology requires robust risk assessment and management from the early stages of the project (i.e. during the site selection phase, prior to injection), which is a challenging task due to the high level of aleatory and epistemic uncertainties. This paper aims at implementing and comparing two frameworks for dealing with uncertainties: a classical probabilistic framework and a probabilistic-fuzzy-based (i.e. jointly combining fuzzy sets and probabilities) one. The comparison of both frameworks is illustrated for assessing the risk related to leakage of brine through an abandoned well on a realistic site in the Paris basin (France). For brine leakage flow computation, a semi-analytical model, requiring 25 input parameters, is used. Depending on the framework, available data is represented in a different manner (either using classical probability laws or interval-valued tools). Though the fuzzy-probabilistic framework for uncertainty propagation is computationally more expensive, it presents the major advantage to highlight situations of high degree of epistemic uncertainty: this enables nuancing a too-optimistic decision-making only supported by a single probabilistic curve (i.e. using the Monte-Carlo results). On this basis, we demonstrate how fuzzy-based sensitivity analysis can help identifying how to reduce the imprecision in an effective way, which has useful applications for additional studies. This study highlights the importance of choices in the mathematical tools for representing the lack of knowledge especially in the early phases of the project, where data is scarce, incomplete and imprecise.
引用
收藏
页码:813 / 829
页数:16
相关论文
共 84 条
[1]  
Apostolakis G(1990)The concept of probability in safety assessments of technological systems Science 250 1359-1364
[2]  
Baudrit C(2005)Post-processing the hybrid method for addressing uncertainty in risk assessments J Environ Eng Div ASCE 131 1750-1754
[3]  
Guyonnet D(2007)Joint propagation of variability and imprecision in assessing the risk of groundwater contamination J Contam Hydrol 93 72-84
[4]  
Dubois D(2008)Representing parametric probabilistic models tainted with imprecision Fuzzy Sets Syst 159 1913-1928
[5]  
Baudrit C(2013)Imprecise probabilities in engineering analyses Mech Syst Signal Process 37 4-29
[6]  
Guyonnet D(2009)Uncertainty theories applied to the analysis of CO Energy Procedia 1 2447-2454
[7]  
Dubois D(2010) plume extension during geological storage Int J Greenhouse Gas Control 4 186-197
[8]  
Baudrit C(2012)Wellbore integrity analysis of a natural CO Int J Greenhouse Gas Control 9 322-333
[9]  
Dubois D(1967) producer Ann Math Stat 38 325-339
[10]  
Perrot N(1994)Assessing health impacts of CO Control Eng Pract 2 811-823