A MILP model for an extended version of the Flexible Job Shop Problem

被引:0
作者
Ernesto G. Birgin
Paulo Feofiloff
Cristina G. Fernandes
Everton L. de Melo
Marcio T. I. Oshiro
Débora P. Ronconi
机构
[1] IME,Department of Computer Science
[2] University of São Paulo,Department of Production Engineering
[3] EPUSP,undefined
[4] University of São Paulo,undefined
来源
Optimization Letters | 2014年 / 8卷
关键词
Scheduling; Flexible Job Shop Problem; MIP models;
D O I
暂无
中图分类号
学科分类号
摘要
A MILP model for an extended version of the Flexible Job Shop Scheduling problem is proposed. The extension allows the precedences between operations of a job to be given by an arbitrary directed acyclic graph rather than a linear order. The goal is the minimization of the makespan. Theoretical and practical advantages of the proposed model are discussed. Numerical experiments show the performance of a commercial exact solver when applied to the proposed model. The new model is also compared with a simple extension of the model described by Özgüven et al. (Appl Math Modell 34:1539–1548, 2010), using instances from the literature and instances inspired by real data from the printing industry.
引用
收藏
页码:1417 / 1431
页数:14
相关论文
共 29 条
[1]  
Alvarez-Valdés R(2005)A heuristic to schedule flexible job-shop in a glass factory Eur. J. Oper. Res. 165 525-534
[2]  
Fuertes A(1993)Routing and scheduling in a flexible job shop by tabu search Ann. Oper. Res. 41 157-183
[3]  
Tamarit JM(2006)Flexible job-shop scheduling problem under resource constraints Int. J. Prod. Res. 44 2071-2089
[4]  
Giménez G(2007)Mathematical modeling and heuristic approaches to flexible job shop scheduling problems J. Intell. Manuf. 18 331-342
[5]  
Ramos R(2011)Modular design of a hybrid genetic algorithm for a flexible job-shop scheduling problem Knowl. Sys. 24 102-112
[6]  
Brandimarte P(1976)The complexity of flowshop and jobshop scheduling Math. Oper. Res. 1 117-129
[7]  
Chan FTS(1960)On the job-shop scheduling problem Oper. Res. 8 219-223
[8]  
Wong TC(1989)Simulation modeling of batch job shop type flexible manufacturing systems J. Mech. Work. Technol. 20 441-450
[9]  
Chan LY(2010)Mathematical models for job-shop scheduling problems with routing and process plan flexibility Appl. Math. Model. 34 1539-1548
[10]  
Fattahi P(2008)A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem Eur. J. Oper. Res. 190 398-411