摘要
We extend the theory of peak-load pricing by considering that the production with different technologies can be adjusted within their capacity at different speeds. In the established analysis, all production decisions can be made after the random variables realize. In our setting, in contrast, some decisions are made before, others after. This is important, e.g., when increasing capacities of renewables are integrated in electricity systems worldwide. We consider fixed load and three types of capacities: partially dispatchable capacity (e.g., nuclear power-plants) needs to be scheduled ahead of actual production, non-dispatchable capacity (e.g., wind turbines) produces randomly, and highly-dispatchable capacity (e.g., gas turbines) can instantly adjust. If capacities differ in their dispatchability, some standard results of peak-load pricing break down. For example, less capacity types will be employed. Either a system with partially dispatchable technologies only, or a system dominated by non-dispatchable technologies and supplemented by highly-dispatchables occurs. Non- and highly dispatchable technologies can be substitutes or complements. The probability of outage does not rise if non-dispatchable capacity becomes cheaper. In a system with non-dispatchables, capacity decisions cannot be decentralized by conventional markets because cost recovery is not possible. Thus, the integration of renewable electricity generators requires alternative market designs.
引用
收藏
页码:105 / 124
页数:19
相关论文
共 102 条
[41]  
Eisenack K(2015)Time of day pricing and the levelized cost of intermittent power generation Energy Economics 48 97-6
[42]  
Raabe T(2017)Start-up costs of thermal power plants in markets with increasing shares of variable renewable generation Nature Energy 2 1-56
[43]  
Helm C(2017)Imagine all these futures: On heterogeneous preferences and mental models in the german energy transition Energy Research and Social Science 27 45-8
[44]  
Mier M(2017)The future cost of electrical energy storage based on experience rates Nature Energy 2 1-610
[45]  
Henriot A(1957)Peak loads and efficient pricing The Quarterly Journal of Economics 71 585-77
[46]  
Glachant JM(2015)Cycling of conventional power plants: Technical limits and actual costs Energy Conversion and Management 97 70-229
[47]  
Hiroux C(1973)Welfare-maximizing price and output with stochastic demand: Comment American Economic Review 63 224-67
[48]  
Saguan M(1995)Optimal generation scheduling with ramping costs IEEE Transactions on Power Systems 10 60-827
[49]  
Hirth L(1966)Peak-load pricing and optimal capacity under indivisibility constraints American Economic Review 56 810-279
[50]  
Hortaçsu A(2018)On the economics of electrical storage for variable renewable energy sources European Economic Review 108 259-undefined