Prediction of water–mud inrush hazard from weathered granite tunnel by an improved seepage erosion model

被引:0
作者
Jin-Quan Liu
Chen Liu
Xiao-Yi Liu
Song Wang
Hai-Liang Yuan
Chang-Jun Li
Jing-Liang Dong
机构
[1] State Key Laboratory of Geomechanics and Geotechnical Engineering,State Key Laboratory On Internet of Things for Smart City, Department of Civil and Environmental Engineering
[2] Institute of Rock and Soil Mechanics,School of Civil Engineering and Architecture
[3] Chinese Academy of Sciences,undefined
[4] China Construction Eighth Engineering Bureau Co,undefined
[5] China National Chemical Engineering Heavy-Mechanized Co,undefined
[6] Zhejiang Institute of Communications Corporation Limited,undefined
[7] East China Jiaotong University,undefined
来源
Bulletin of Engineering Geology and the Environment | 2021年 / 80卷
关键词
Tunnel construction; Water and mud inflow; Seepage erosion model; Prevention measurements; Permeability;
D O I
暂无
中图分类号
学科分类号
摘要
During tunnel construction, water and mud inrush disasters from completely weathered granite usually lead to the serious casualties and economic losses. Predicting these disasters are vital to the safety construction. Considering the critical erosion condition and flow pattern variation at the three stages (Darcy, rapid, and stable flow stages), a seepage erosion model is developed to perform the coupling analysis of water and mud inrush evolution. The model is shown to have favorable accuracy in real-time predicting the erosion region, ground settlement region, and the main hydraulic parameters (i.e., permeability, water inflow, and mud inflow) by comparison with the laboratory tests and field investigations. Then, effects of the model parameters (i.e., particle diameter, erosion coefficient, and ground permeability) on the water and mud inrush are investigated. Results show that (1) with the decreasing particle diameter, the permeability and the water and mud inflow increase gradually. (2) The erosion coefficient mainly affects the evolution rate and time of the water and mud inrush disaster. (3) The water and mud inrush can be controlled when the ground permeability decreased to the 0.2 time of the initial value. The research findings and the proposed model can provide the reference for the water inrush prevention in a similar project.
引用
收藏
页码:9249 / 9266
页数:17
相关论文
共 115 条
  • [111] Li P(undefined)undefined undefined undefined undefined-undefined
  • [112] Tian S(undefined)undefined undefined undefined undefined-undefined
  • [113] Zhou YX(undefined)undefined undefined undefined undefined-undefined
  • [114] Zhu WC(undefined)undefined undefined undefined undefined-undefined
  • [115] Wei CH(undefined)undefined undefined undefined undefined-undefined