Integration of concept maturity in decision-making for engineering design: an application to a solar collector development

被引:0
作者
Mehdi El Amine
Jérôme Pailhes
Nicolas Perry
机构
[1] I2M – UMR 5295,Arts et Métiers ParisTech
来源
Research in Engineering Design | 2017年 / 28卷
关键词
Decision-making; Set-based conceptual design; Risk; Performance; Trade-off;
D O I
暂无
中图分类号
学科分类号
摘要
The presence of immature concepts makes decision-making difficult in upstream phases of a development project. A company’s enthusiasm to improve product performance by exploring novel concepts is hampered by a low maturity that results in an inherent risk of cost overruns and schedule delays. Besides this, decisions taken during conceptual design phases have a critical impact on product life-cycle cost. In this context, a useful practice is to develop two or more concepts in parallel and delay decision-making until sufficient knowledge is generated. Even so, a preliminary screening of concepts is usually needed because of the substantial resources and time required for the development activities. In this paper, a concept screening approach is proposed at the conceptual design phase on the basis of two metrics. The first assesses risk related to the non-completion of design criteria while respecting available time (consideration of deadline) and company resources. The second metric assesses the expected performance of novel concepts compared with the existing products. It uses preference functions and generalized ordered weighted averaging operators. Fuzzy logic tools are used in the two metrics to capture and propagate imprecision in the description of design and external environment. In order to prove its value, the proposed approach was applied to the development of a solar collector in an industrial environment.
引用
收藏
页码:235 / 250
页数:15
相关论文
共 50 条
[1]  
Antonsson EK(1995)Imprecision in engineering design J Mech Des Trans ASME 117 25-32
[2]  
Otto KN(2012)Arc-elasticity and hierarchical exploration of the neighborhood of solutions in mechanical design Adv Eng Inform 26 603-617
[3]  
Collignan C(2011)Estimating technology readiness level coefficients J Spacecr Rockets 48 146-152
[4]  
Sebastian P(1987)Fuzzy weighted averages and implementation of the extension principle Fuzzy Sets Syst 21 183-199
[5]  
Pailhes J(1990)Simultaneous engineering side-by-side to success Engineer 271 51-53
[6]  
Ledoux Y(1998) Tentative guidelines to help choosing an appropriate MCDA method European Journal of Operational Research 109 501-521
[7]  
Conrow E(2005)The paradox of using tacit and explicit knowledge Manage Decis 43 102-112
[8]  
Dong WM(2015)The relationship of technology and design maturity to DoD weapon system cost change and schedule change during engineering and manufacturing development Syst Eng 43 210-217
[9]  
Wong FS(1996)Managing the simultaneous execution of coupled phases in concurrent product development IEEE Trans Eng Manag 4 376-390
[10]  
Dunn J(2015)Fresnel lens: a promising alternative of reflectors in concentrated solar power Renew Sustain Energy Rev 41 214-227