Inverse scheduling with maximum lateness objective

被引:0
|
作者
Peter Brucker
Natalia V. Shakhlevich
机构
[1] Universität Osnabrück,Fachbereich Mathematik/Informatik
[2] University of Leeds,School of Computing
来源
Journal of Scheduling | 2009年 / 12卷
关键词
Single-machine scheduling; Maximum lateness; Inverse optimization;
D O I
暂无
中图分类号
学科分类号
摘要
We study a range of counterparts of the single-machine scheduling problem with the maximum lateness criterion that arise in the context of inverse optimization. While in the forward scheduling problem all parameters are given and the objective is to find the optimal job sequence for which the value of the maximum lateness is minimum, in inverse scheduling the exact values of processing times or due dates are unknown, and they should be determined so that a prespecified solution becomes optimal. We perform a fairly complete classification of the corresponding inverse models under different types of norms that measure the deviation of adjusted parameters from their given estimates.
引用
收藏
页码:475 / 488
页数:13
相关论文
共 50 条