A Novel Step Toward Repetitive Projects Scheduling Using Geographic Information Systems

被引:0
作者
Anjul Tomar
V. K. Bansal
机构
[1] National Institute of Technology Hamirpur,Department of Civil Engineering
来源
Arabian Journal for Science and Engineering | 2020年 / 45卷
关键词
Scheduling; LOB; CPM; Repetitive projects;
D O I
暂无
中图分类号
学科分类号
摘要
Unique scheduling challenges are presented by the construction projects having repetitive activities. The present study deals with the development of a scheduling tool to meet the requirements of projects having repetitive activities. Generally, the schedule of a repetitive construction project is made by using commercially available scheduling tools like Primavera and Microsoft Project. The link between 2D drawings/3D components and repetitive schedule is missing in these scheduling tools. The literature indicates the use of 4D modeling in case of non-repetitive construction projects to establish this link. In 4D modeling, a graphical simulation of the execution sequence is developed by linking 3D components with the schedule of a facility to be developed. 4D modeling tools lack in certain features such as generating/updating schedule, linking 3D components with schedule, and consideration of surroundings into a common platform. Geographic information systems-based environment has been explored in the present study for the development of the tool for repetitive scheduling, linking 3D components with the repetitive schedule, and to develop 4D model of the execution sequence of a repetitive construction project. 3D components developed for 4D modeling were also used for cost estimation. 4D model of the execution sequence and cost estimate together constitutes a 5D system for repetitive construction projects.
引用
收藏
页码:3983 / 3997
页数:14
相关论文
共 66 条
  • [1] Tomar A(2019)Scheduling of repetitive construction projects using geographic information systems: an integration of critical path method and line of balance Asian J. Civil Eng. 20 549-562
  • [2] Bansal VK(1992)Linear scheduling and visualization Transp. Res. Rec. 1351 32-39
  • [3] Vorster MC(2016)Repetitive scheduling method: requirements, modeling, and implementation J. Constr. Eng. Manag. 142 04016002-491
  • [4] Beliveau YJ(1986)Application of linear scheduling J. Constr. Eng. Manag. 112 476-278
  • [5] Bafna T(1998)Scheduling projects with repeating activities J. Constr. Eng. Manag. 124 269-412
  • [6] Ioannou PG(1974)Planning construction of repetitive building units J. Constr. Div. 100 403-582
  • [7] Yang IT(2018)Location-based planning and scheduling of highway construction projects in hilly terrain using GIS Can. J. Civil Eng. 45 570-52
  • [8] Chrzanowski EN(2018)Comparison of point cloud data and 3D CAD data for on-site dimensional inspection of industrial plant piping systems Autom. Constr. 91 44-316
  • [9] Johnston DW(2018)Integrating mobile building information modelling and augmented reality systems: an experimental study Autom. Constr. 85 305-162
  • [10] Harris RB(2018)A critical review of virtual and augmented reality (VR/AR) applications in construction safety Autom. Constr. 86 150-65