Preventive Maintenance Prioritization by Fuzzy Logic for Seamless Hydro Power Generation

被引:3
作者
Roy P.K. [1 ]
Adhikary P. [2 ]
Mazumdar A. [1 ]
机构
[1] School of Water Resources Engineering, Jadavpur University, Kolkata
[2] Department of Mechanical Engineering, Swami Vivekananda Institute of Science and Technology (WBUT), Kolkata
关键词
Equipment breakdown; Fuzzy logic; Hydro power; Preventive maintenance;
D O I
10.1007/s40030-014-0076-9
中图分类号
学科分类号
摘要
Preventive maintenance prioritization is one of the most important criteria for the electricity generation planners to minimize the down time and production costs. Break down of equipments increases costs and plant down time results in loss of business. This work focuses on prioritizing the preventive maintenance for seamless hydro power generation considering (24 × 7) client’s power demand using fuzzy logic. The main task involves prioritizing the maintenance work considering constraints of varied power demand and hydro turbine plant breakdown. Fuzzy logic is used to optimize the preventive maintenance prioritization under the main constraints. Manual fuzzy arithmetic is used to develop the model and MATLAB Fuzzy Inference System editor used to validate the same. This novel fuzzy logic approach of preventive maintenance prioritizing for hydro power generation is absent in renewable power generation and industrial engineering literatures due to its assessment complexity. © 2014, The Institution of Engineers (India).
引用
收藏
页码:97 / 104
页数:7
相关论文
共 50 条
[41]   Proposed Fuzzy Logic System for Voltage Regulation and Power Factor Improvement in Power Systems with High Infiltration of Distributed Generation [J].
Tshivhase, Ndamulelo ;
Hasan, Ali N. ;
Shongwe, Thokozani .
ENERGIES, 2020, 13 (16)
[42]   A fuzzy-logic model for benchmarking concrete roof maintenance [J].
Peiris, Sanduni ;
De Silva, Nayanthara .
FACILITIES, 2021, 39 (7/8) :568-583
[43]   Process control for thermal comfort maintenance using fuzzy logic [J].
Baus, Zoran L. ;
Nikolovski, Srete N. ;
Maric, Predrag Z. .
JOURNAL OF ELECTRICAL ENGINEERING-ELEKTROTECHNICKY CASOPIS, 2008, 59 (01) :34-39
[44]   Using a fuzzy logic approach for the predictive maintenance of textile machines [J].
Baban, Calin Florin ;
Baban, Marius ;
Suteu, Marius Darius .
JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2016, 30 (02) :999-1006
[45]   Maintenance Estimation with Modbus-Based Communication and Fuzzy Logic [J].
Ceyhan, Aytac ;
Akay, Rustu .
29TH IEEE CONFERENCE ON SIGNAL PROCESSING AND COMMUNICATIONS APPLICATIONS (SIU 2021), 2021,
[46]   Street lighting maintenance management system based on fuzzy logic [J].
Barrios Martinez, Francisco Alexei ;
Sierra Gil, Eduardo ;
Borges Vasconcellos, Davel Eduardo ;
Gondres Torne, Israel .
JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2025, 31 (01) :105-128
[47]   A novel method for life estimation of power transformers using fuzzy logic systems: An intelligent predictive maintenance approach [J].
Naeem, Muhammad Farhan ;
Hashmi, Khurram ;
Kashif, Syed Abdul Rahman ;
Khan, Muhammad Mansoor ;
Alghaythi, Mamdouh L. ;
Aymen, Flah ;
Ali, Samia G. ;
AboRas, Kareem M. ;
Ben Dhaou, Imed .
FRONTIERS IN ENERGY RESEARCH, 2022, 10
[48]   Prioritizing equipments for preventive maintenance (PM) activities using fuzzy rules [J].
Khanlari, Amir ;
Mohammadi, Kaveh ;
Sohrabi, Babak .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (02) :169-184
[49]   Fuzzy Artificial Immune System based Generators Preventive Maintenance Scheduling [J].
Djibo, Marounfa ;
El-Sharkh, M. Y. ;
Sisworahardjo, N. .
SOUTHEASTCON 2022, 2022, :649-654
[50]   Fuzzy sets and logic in power system protection [J].
Kasztenny, B ;
Rosolowski, E ;
Saha, MM ;
Hillstrom, B .
ENGINEERING INTELLIGENT SYSTEMS FOR ELECTRICAL ENGINEERING AND COMMUNICATIONS, 1997, 5 (04) :193-203