Preventive Maintenance Prioritization by Fuzzy Logic for Seamless Hydro Power Generation

被引:3
作者
Roy P.K. [1 ]
Adhikary P. [2 ]
Mazumdar A. [1 ]
机构
[1] School of Water Resources Engineering, Jadavpur University, Kolkata
[2] Department of Mechanical Engineering, Swami Vivekananda Institute of Science and Technology (WBUT), Kolkata
关键词
Equipment breakdown; Fuzzy logic; Hydro power; Preventive maintenance;
D O I
10.1007/s40030-014-0076-9
中图分类号
学科分类号
摘要
Preventive maintenance prioritization is one of the most important criteria for the electricity generation planners to minimize the down time and production costs. Break down of equipments increases costs and plant down time results in loss of business. This work focuses on prioritizing the preventive maintenance for seamless hydro power generation considering (24 × 7) client’s power demand using fuzzy logic. The main task involves prioritizing the maintenance work considering constraints of varied power demand and hydro turbine plant breakdown. Fuzzy logic is used to optimize the preventive maintenance prioritization under the main constraints. Manual fuzzy arithmetic is used to develop the model and MATLAB Fuzzy Inference System editor used to validate the same. This novel fuzzy logic approach of preventive maintenance prioritizing for hydro power generation is absent in renewable power generation and industrial engineering literatures due to its assessment complexity. © 2014, The Institution of Engineers (India).
引用
收藏
页码:97 / 104
页数:7
相关论文
共 50 条
[31]   A fuzzy-logic-based method for maintenance prioritization of high-voltage SF6 circuit breakers, considering uneven wear [J].
Diahovchenko, Illia ;
Korzh, Pavlo ;
Kolcun, Michal .
RESULTS IN ENGINEERING, 2022, 16
[32]   Fuzzy Logic Controlled Microturbine Generation System for Distributed Generation [J].
Nayak, Sanjeev K. ;
Gaonkar, D. N. ;
Shivarudraswamy, R. .
2011 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY ENGINEERING (ICAEE), 2012, 14 :1213-1219
[33]   Multi-criteria prioritization of the renewable power plants in Australia using the fuzzy logic in decision-making method (FMCDM) [J].
Aryanfar, Amin ;
Gholami, Aslan ;
Ghorbannezhad, Payam ;
Yeganeh, Bijan ;
Pourgholi, Mahdi ;
Zandi, Majid ;
Stevanovic, Svetlana .
CLEAN ENERGY, 2022, 6 (01) :780-798
[34]   Preventive maintenance testing of shielded power cable systems [J].
Mashikian, MS .
CONFERENCE RECORD OF 2001 ANNUAL PULP AND PAPER INDUSTRY TECHNICAL CONFERENCE, 2001, :59-66
[35]   Preventive maintenance testing of shielded power cable systems [J].
Mashikian, MS .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2002, 38 (03) :736-743
[36]   Preventive Maintenance and Forced Outages in Power Plants in Korea [J].
Kim, Tae-Woo ;
Chang, Yenjae ;
Kim, Dae-Wook ;
Kim, Man-Keun .
ENERGIES, 2020, 13 (14)
[37]   Power system energy generation and deliveration costs simulation using a fuzzy logic and neural networks [J].
Sroczan, E .
SIMULATION IN INDUSTRY'99: 11TH EUROPEAN SIMULATION SYMPOSIUM 1999, 1999, :399-403
[38]   Multi-agent approach to reliability assessment of power system generation using fuzzy logic [J].
Shalash N.A. ;
Ahmad A.Z. ;
Jaber A.S. .
International Journal of Simulation: Systems, Science and Technology, 2016, 17 (32)
[39]   Application of fuzzy logic based expert system in preventive lightning protection [J].
Nemeth, Balint ;
Kiss, Istvan .
JOURNAL OF ELECTROSTATICS, 2009, 67 (2-3) :477-481
[40]   Preventive Conservation and Restoration Monitoring of Heritage Buildings Based on Fuzzy Logic [J].
Moreno, M. ;
Prieto, A. J. ;
Ortiz, R. ;
Cagigas-Muniz, D. ;
Becerra, J. ;
Garrido-Vizuete, M. A. ;
Segura, D. ;
Macias-Bernal, J. M. ;
Chavez, M. J. ;
Ortiz, P. .
INTERNATIONAL JOURNAL OF ARCHITECTURAL HERITAGE, 2023, 17 (07) :1153-1170