Preventive Maintenance Prioritization by Fuzzy Logic for Seamless Hydro Power Generation

被引:3
作者
Roy P.K. [1 ]
Adhikary P. [2 ]
Mazumdar A. [1 ]
机构
[1] School of Water Resources Engineering, Jadavpur University, Kolkata
[2] Department of Mechanical Engineering, Swami Vivekananda Institute of Science and Technology (WBUT), Kolkata
关键词
Equipment breakdown; Fuzzy logic; Hydro power; Preventive maintenance;
D O I
10.1007/s40030-014-0076-9
中图分类号
学科分类号
摘要
Preventive maintenance prioritization is one of the most important criteria for the electricity generation planners to minimize the down time and production costs. Break down of equipments increases costs and plant down time results in loss of business. This work focuses on prioritizing the preventive maintenance for seamless hydro power generation considering (24 × 7) client’s power demand using fuzzy logic. The main task involves prioritizing the maintenance work considering constraints of varied power demand and hydro turbine plant breakdown. Fuzzy logic is used to optimize the preventive maintenance prioritization under the main constraints. Manual fuzzy arithmetic is used to develop the model and MATLAB Fuzzy Inference System editor used to validate the same. This novel fuzzy logic approach of preventive maintenance prioritizing for hydro power generation is absent in renewable power generation and industrial engineering literatures due to its assessment complexity. © 2014, The Institution of Engineers (India).
引用
收藏
页码:97 / 104
页数:7
相关论文
共 50 条
[21]   Generation reliability assessment in power market using fuzzy logic and Monte Carlo simulation [J].
Haroonabadi, H. ;
Haghifam, M. -R. .
2007 INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS APPLICATIONS TO POWER SYSTEMS, VOLS 1 AND 2, 2007, :305-+
[22]   Fuzzy Logic Controller to Control Voltage and Reactive Power Flow at the Network with Distribute Generation [J].
Ahmad, Ahmadova Tamella ;
Bayram, Guliyev Huseyngulu .
PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2017, 502 :329-340
[23]   Risk Assessment of Maintenance activities using Fuzzy Logic [J].
Gallaba, Maryam ;
Bouloiz, Hafida ;
Alaoui, Youssef Lamrani ;
Tkiouat, Mohamed .
SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTING IN DATA SCIENCES (ICDS2018), 2019, 148 :226-235
[24]   Maintenance Scheduling of the Embroidery Machines Based on Fuzzy Logic [J].
Baban, Marius ;
Baban, Calin Florin ;
Toth , Edit .
2019 24TH INTERNATIONAL CONFERENCE ON METHODS AND MODELS IN AUTOMATION AND ROBOTICS (MMAR), 2019, :111-114
[25]   Industrial maintenance metrics based on simulation and fuzzy logic [J].
Bruzzone, AG ;
Briano, C ;
Simeoni, S .
SIMULATION IN INDUSTRY, 2004, :75-80
[26]   Fuzzy logic in power system performability [J].
Dumitrescu, M ;
Munteanu, T ;
Ulmeanu, AP .
2004 2ND INTERNATIONAL IEEE CONFERENCE INTELLIGENT SYSTEMS, VOLS 1 AND 2, PROCEEDINGS, 2004, :326-330
[27]   System for assessing the sustainability conditions of small hydro plants by fuzzy logic [J].
Clauberg, Ana Paula Coelho ;
de Mello, Renato ;
Simioni, Flavio Jose ;
Sehnem, Simone .
SUSTAINABLE DEVELOPMENT, 2021, 29 (02) :300-317
[28]   Selection of Prioritization Technique for Software Requirement using Fuzzy Logic and Decision Tree [J].
Dhingra, Swati ;
Savithri, G. ;
Madan, Meghna ;
Manjula, R. .
PROCEEDINGS OF 2016 ONLINE INTERNATIONAL CONFERENCE ON GREEN ENGINEERING AND TECHNOLOGIES (IC-GET), 2016,
[29]   Pre-Dispatch of Load in Thermoelectric Power Plants Considering Maintenance Management Using Fuzzy Logic [J].
Fonseca Junior, Milton ;
Bezerra, Ubiratan Holanda ;
Brito Junior, Jorge De Almeida ;
Leite, Jandecy Cabral ;
Reis Nascimento, Manoel Henrique .
IEEE ACCESS, 2018, 6 :41379-41390
[30]   An Adaptive Bayesian Approach With Subjective Logic Reliability Networks for Preventive Maintenance [J].
Uzunoglu, Bahri .
IEEE TRANSACTIONS ON RELIABILITY, 2020, 69 (03) :916-924