共 50 条
- [22] Meta-synthesis pattern of post-disaster recovery and reconstruction: based on actual investigation on 2008 Wenchuan earthquake Natural Hazards, 2012, 60 : 199 - 222
- [24] Impacts of Sense of Community and Satisfaction with Governmental Recovery on Psychological Status of the Wenchuan Earthquake Survivors Social Indicators Research, 2014, 117 : 421 - 436
- [25] Reflections on Livelihood Issue in Post-disaster Reconstruction Planning of Wenchuan Earthquake SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 233 - 243
- [26] On the Role and Value of the Local Government during Wenchuan Post-earthquake Reconstruction PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (5TH), VOL I, 2009, : 428 - 432
- [27] Analysis of the post-earthquake economic recovery of the most severely affected areas in the 2008 Wenchuan earthquake Natural Hazards, 2022, 114 : 2633 - 2655
- [29] Tourist Function Zone Planning and Spatial Management-A Case Study of Wenchuan Post-Earthquake Tourism Recovery and Reconstruction ENVIRONMENT, LOW-CARBON AND STRATEGY, 2011, : 258 - 269