Modeling and analyzing project interdependencies in project portfolios using an integrated social network analysis-fuzzy TOPSIS MICMAC approach

被引:0
作者
Helal Al Zaabi
Hamdi Bashir
机构
[1] University of Sharjah,Department of Industrial Engineering and Engineering Management
来源
International Journal of System Assurance Engineering and Management | 2020年 / 11卷
关键词
Projects portfolio management; Project interdependencies; Social network; Visual tools; Fuzzy TOPSIS; Integrated network-fuzzy cross-impact matrix multiplication analysis (MICMAC); H43; M1; O22;
D O I
暂无
中图分类号
学科分类号
摘要
Despite academics’ and practitioners’ increasing focus on project portfolio management over the last three decades, very few methods and tools have been proposed for modeling and analyzing interdependencies among projects within a portfolio. This paper proposes the use of a novel approach that integrates three techniques: social network analysis (SNA), fuzzy technique for order of preference by similarity to ideal solution (TOPSIS), and cross-impact matrix multiplication applied to classification (MICMAC). Network mapping provides project managers with a holistic view of interdependencies among projects; fuzzy TOPSIS MICMAC and SNA measures are used to classify projects in terms of their driving power and dependence power and out- and in-degree centrality. This categorization offers a helpful tool for project managers to distinguish among projects and classify them based on their interdependency levels, and thus, aids in identifying critical projects. For the demonstration, the approach is applied to model and analyze interdependencies between projects within a real-life portfolio from the industry. The results of this application show that the proposed approach can serve as a viable and practical means of capturing and analyzing interdependencies among projects within a portfolio.
引用
收藏
页码:1083 / 1106
页数:23
相关论文
共 127 条
  • [1] Aaker DA(1978)A model for the selection of interdependent R&D projects IEEE Trans Eng Manag 25 30-36
  • [2] Tyebjee TT(2010)Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods Expert Syst Appl 37 6218-6224
  • [3] Amiri MP(1999)An integrated framework for project portfolio selection Int J Project Manag 17 207-216
  • [4] Archer NP(2004)Prioritizing a portfolio of information technology investment projects J Manag Inf Syst 21 33-60
  • [5] Ghasemzadeh F(2006)Information leaders in product development organizational networks: social network analysis of the design structure matrix IEEE Trans Eng Manag 53 570-582
  • [6] Bardhan I(2016)Managing project interdependencies in IT/IS project portfolios: a review of managerial issues Int J Inf Syst Proj Manag 4 67-82
  • [7] Bagchi S(2016)An integrated ISM fuzzy MICMAC approach for modelling the supply chain knowledge flow enablers Int J Prod Res 54 7374-7399
  • [8] Sougstad R(2017)Handling project dependencies in portfolio management Proc Comput Sci 121 356-363
  • [9] Batallas DA(2008)Constructing strategies in strategic planning: a decision support evaluation model Oper Res Int J 8 153-166
  • [10] Yassine AA(2008)Project portfolio management—there’s more to it than what management enacts Int J Proj Manag 26 357-365