Solution approaches for a real-life resource-constrained parallel machine scheduling problem

被引:1
|
作者
Emrah B. Edis
Irem Ozkarahan
机构
[1] Dokuz Eylul University,Department of Industrial Engineering
[2] Troy University,Computer Science Department
来源
The International Journal of Advanced Manufacturing Technology | 2012年 / 58卷
关键词
Parallel machine scheduling; Resource constraints; Machine eligibility; Integer programming; Constraint programming;
D O I
暂无
中图分类号
学科分类号
摘要
This paper deals with a real-world scheduling problem in an injection-molding department of an electrical appliance plant. In the department, a resource-constrained parallel machine scheduling problem with machine eligibility restrictions is investigated. First, an integer-programming (IP) model with the objective of minimizing makespan is developed for the entire problem. Since this entire IP model has a huge number of variables, it cannot handle the problem efficiently. To obtain more efficient results, two solution approaches, namely IP/IP and IP/constraint programming (CP) both of which partition the entire problem into loading and scheduling sub-problems, are proposed. The loading phase, in which an IP loading model assigns the jobs to machines with the aim of minimizing maximum load on the machines and operators, is the same for both approaches. Subsequently, in the scheduling phase, the IP/IP approach uses an IP scheduling model while the IP/CP approach applies a CP scheduling model to obtain the final schedule of the jobs. Computational results show that the proposed solution methods improve makespan values for almost all test problems in comparison to the entire IP model. In particular, the IP/IP approach performs better in the test problems with greater number of operators, whereas IP/CP approach provides quick and practical results in almost all test problems and gives relatively more efficient makespan values when the resource constraints are tight (i.e., the case of smaller number of operators).
引用
收藏
页码:1141 / 1153
页数:12
相关论文
共 50 条
  • [41] Flow shop non-idle scheduling and resource-constrained scheduling
    Yen-Shing Tsai
    Bertrand M. T. Lin
    Annals of Operations Research, 2016, 238 : 577 - 585
  • [42] Flow shop non-idle scheduling and resource-constrained scheduling
    Tsai, Yen-Shing
    Lin, Bertrand M. T.
    ANNALS OF OPERATIONS RESEARCH, 2016, 238 (1-2) : 577 - 585
  • [43] Critical Sequences and Resource Links Optimization in Resource-Constrained Project Scheduling
    Cui, Wan-An
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2018, 35 (05)
  • [44] A Constraint Programming Formulation of the Multi-Mode Resource-Constrained Project Scheduling Problem for the Flexible Job Shop Scheduling Problem
    Yuraszeck, Francisco
    Montero, Elizabeth
    Canut-De-Bon, Dario
    Cuneo, Nicolas
    Rojel, Maximiliano
    IEEE ACCESS, 2023, 11 : 144928 - 144938
  • [45] A Computational Study of Constraint Programming Approaches for Resource-Constrained Project Scheduling with Autonomous Learning Effects
    Hill, Alessandro
    Ticktin, Jordan
    Vossen, Thomas W. M.
    INTEGRATION OF CONSTRAINT PROGRAMMING, ARTIFICIAL INTELLIGENCE, AND OPERATIONS RESEARCH, 2021, 12735 : 26 - 44
  • [46] SOLUTION APPROACHES FOR SIMULTANEOUS SCHEDULING OF JOBS AND OPERATORS ON PARALLEL MACHINES
    Edis, Emrah B.
    Oguz, Ceyda
    Ozkarahan, Irem
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2012, 27 (03): : 527 - 535
  • [47] Unrelated Parallel Machine Photolithography Scheduling Problem With Dual Resource Constraints
    Chen, Haichao
    Guo, Peng
    Jimenez, Jesus
    Dong, Zhijie Sasha
    Cheng, Wenming
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2023, 36 (01) : 100 - 112
  • [48] A dynamic population steady-state genetic algorithm for the resource-constrained project scheduling problem
    Cervantes, Mariamar
    Lova, Antonio
    Tormos, Pilar
    Barber, Federico
    NEW FRONTIERS IN APPLIED ARTIFICIAL INTELLIGENCE, 2008, 5027 : 611 - +
  • [49] An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
    Bruni, M. E.
    Pugliese, L. Di Puglia
    Beraldi, P.
    Guerriero, F.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 71 : 66 - 84
  • [50] An adapted constraint-programming formulation of the resource-constrained project scheduling problem applied to the identical parallel machines group shop and mixed shop scheduling problems
    Yuraszeck, Francisco
    Mejia, Gonzalo
    Luer-Villagra, Armin
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2025, 32 (03) : 1422 - 1441