Solution approaches for a real-life resource-constrained parallel machine scheduling problem

被引:1
|
作者
Emrah B. Edis
Irem Ozkarahan
机构
[1] Dokuz Eylul University,Department of Industrial Engineering
[2] Troy University,Computer Science Department
来源
The International Journal of Advanced Manufacturing Technology | 2012年 / 58卷
关键词
Parallel machine scheduling; Resource constraints; Machine eligibility; Integer programming; Constraint programming;
D O I
暂无
中图分类号
学科分类号
摘要
This paper deals with a real-world scheduling problem in an injection-molding department of an electrical appliance plant. In the department, a resource-constrained parallel machine scheduling problem with machine eligibility restrictions is investigated. First, an integer-programming (IP) model with the objective of minimizing makespan is developed for the entire problem. Since this entire IP model has a huge number of variables, it cannot handle the problem efficiently. To obtain more efficient results, two solution approaches, namely IP/IP and IP/constraint programming (CP) both of which partition the entire problem into loading and scheduling sub-problems, are proposed. The loading phase, in which an IP loading model assigns the jobs to machines with the aim of minimizing maximum load on the machines and operators, is the same for both approaches. Subsequently, in the scheduling phase, the IP/IP approach uses an IP scheduling model while the IP/CP approach applies a CP scheduling model to obtain the final schedule of the jobs. Computational results show that the proposed solution methods improve makespan values for almost all test problems in comparison to the entire IP model. In particular, the IP/IP approach performs better in the test problems with greater number of operators, whereas IP/CP approach provides quick and practical results in almost all test problems and gives relatively more efficient makespan values when the resource constraints are tight (i.e., the case of smaller number of operators).
引用
收藏
页码:1141 / 1153
页数:12
相关论文
共 50 条
  • [21] An adaptive machine learning algorithm for the resource-constrained classification problem
    Shifman, Danit Abukasis
    Cohen, Izack
    Huang, Kejun
    Xian, Xiaochen
    Singer, Gonen
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 119
  • [22] An adaptive memory programming framework for the resource-constrained project scheduling problem
    Paraskevopoulos, Dimitris C.
    Tarantilis, Christos D.
    Ioannou, George
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) : 4938 - 4956
  • [23] Resource-Constrained Project Scheduling Problem under Multiple Time Constraints
    Kong, Feng
    Dou, Dong
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [24] Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem
    Liu, Yongli
    Li, Renjie
    Liu, Huiran
    IEEE ACCESS, 2020, 8 : 142269 - 142281
  • [25] An integer programming approach to the multimode resource-constrained multiproject scheduling problem
    Túlio A. M. Toffolo
    Haroldo G. Santos
    Marco A. M. Carvalho
    Janniele A. Soares
    Journal of Scheduling, 2016, 19 : 295 - 307
  • [26] An updated survey of variants and extensions of the resource-constrained project scheduling problem *
    Hartmann, Sonke
    Briskorn, Dirk
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 297 (01) : 1 - 14
  • [27] An integer programming approach to the multimode resource-constrained multiproject scheduling problem
    Toffolo, Tulio A. M.
    Santos, Haroldo G.
    Carvalho, Marco A. M.
    Soares, Janniele A.
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 295 - 307
  • [28] On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations
    Schnell, Alexander
    Hartl, Richard F.
    OR SPECTRUM, 2016, 38 (02) : 283 - 303
  • [29] On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations
    Alexander Schnell
    Richard F. Hartl
    OR Spectrum, 2016, 38 : 283 - 303
  • [30] Heuristic Methods for Finance-Based and Resource-Constrained Project Scheduling Problem
    Liu, Wanlin
    Zhang, Jingwen
    Li, Wanjun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (11)