A two-phase approach to solve the synchronized bin–forklift scheduling problem

被引:0
作者
Nizar El Hachemi
Mohammed Saddoune
Issmail El Hallaoui
Louis-Martin Rousseau
机构
[1] Université Mohammed V Agdal,Département de génie industriel, École Mohammadia d’Ingénieurs
[2] Université Hassan II,Faculté des Sciences Techniques de Mohammedia
[3] École Polytechnique de Montréal,Département de mathématiques et génie industriel
[4] Université de Montréal,CIRRELT
[5] GERAD,undefined
来源
Journal of Intelligent Manufacturing | 2018年 / 29卷
关键词
Scheduling; Column generation; Mixed-integer programming; Textile industry;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we propose a two-phase approach to solve a combined routing and scheduling problem that occurs in the textile industry: fabrics are dyed by dye-jets and transported by forklifts. The objective is to minimize the cost of the unproductive activities, i.e., the dye-jet setup times and the forklift waiting time. The first phase solves an integer linear program to assign jobs (fabrics) to dye-jets while minimizing the setup cost; we compare an arc-based and a path-based formulation. The second phase uses a mixed-integer linear program for the dye-jet scheduling and both the routing and scheduling of forklifts. Experiments are performed on real data provided by a major multinational company, and larger test problems are randomly generated to assess the algorithm. The tests were conducted using Cplex 12.6.0 and a column generation solver. The numerical results show that our approach is efficient in terms of both solution quality and computational time.
引用
收藏
页码:651 / 657
页数:6
相关论文
共 50 条
  • [41] Two calibrated meta-heuristics to solve an integrated scheduling problem of production and air transportation with the interval due date
    Mousavi, M.
    Hajiaghaei-Keshteli, M.
    Tavakkoli-Moghaddam, R.
    SOFT COMPUTING, 2020, 24 (21) : 16383 - 16411
  • [42] Two calibrated meta-heuristics to solve an integrated scheduling problem of production and air transportation with the interval due date
    M. Mousavi
    M. Hajiaghaei–Keshteli
    R. Tavakkoli–Moghaddam
    Soft Computing, 2020, 24 : 16383 - 16411
  • [43] A two-phase hybrid evolutionary algorithm for solving the bi-objective scheduling multiprocessor tasks on two dedicated processors
    Baatout, Fatma-Zohra
    Hifi, Mhand
    JOURNAL OF HEURISTICS, 2023, 29 (2-3) : 229 - 267
  • [44] A two-phase hybrid evolutionary algorithm for solving the bi-objective scheduling multiprocessor tasks on two dedicated processors
    Fatma-Zohra Baatout
    Mhand Hifi
    Journal of Heuristics, 2023, 29 : 229 - 267
  • [45] Planning inland vessel operations in large seaports using a two-phase approach
    Li, Shijie
    Negenborn, Rudy R.
    Lodewijks, Gabriel
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 106 : 41 - 57
  • [46] A Metric Approach for the Two-Station Single-Track Railway Scheduling Problem
    Cheng, T. C. Edwin
    Lazarev, Alexander
    Lemtyuzhnikova, Darya
    IFAC PAPERSONLINE, 2022, 55 (10): : 2875 - 2880
  • [47] An Iterative Two-Phase Optimization Method Based on Divide and Conquer Framework for Integrated Scheduling of Multiple UAVs
    Liu, Huan
    Li, Xiamiao
    Wu, Guohua
    Fan, Mingfeng
    Wang, Rui
    Gao, Liang
    Pedrycz, Witold
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2021, 22 (09) : 5926 - 5938
  • [48] An efficient tabu search approach for the two-machine preemptive open shop scheduling problem
    Liaw, CF
    COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (14) : 2081 - 2095
  • [49] Application of two-phase decomposition algorithm to practical airline crew rostering problem for fair working time
    Doi, Tsubasa
    Nishi, Tatsushi
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2016, 10 (03):
  • [50] A two-phase Pareto front method for solving the bi-objective personnel task rescheduling problem
    Borgonjon, Tessa
    Maenhout, Broos
    COMPUTERS & OPERATIONS RESEARCH, 2022, 138